MIS18-00003
| MEC-Conference | 1/5/2018 | 1/5/2018 | 1/5/2018 3:54:19 PM | P | NH |
|
|
as per Dan-furnace installed w/o permits-h.o. Don ###-####- no one home- called number listed no mail box to leave message to call me about issue
|
MEC18-00084
| Final | 1/5/2018 | 1/5/2018 | 1/5/2018 3:36:08 PM | P | PART |
|
|
Contact name: Jason Phone #: ###-#### Inspection requested via web by Melissa Kaae- register and flex duct ok to registers in new locations- ok for ceiling tiles- need air balance report to final out
|
MEC17-04281
| Final | 1/5/2018 | 1/5/2018 | 1/5/2018 2:57:49 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz- need uv protection on all outdoor A/C- need approved manual J onsite could not find any in units- need to seal outside air in closet north east unit- air balance reports ok
|
MEC17-02966
| Final | 1/5/2018 | 1/5/2018 | 1/5/2018 2:35:23 PM | P | PASS |
|
|
Apartment 411. See office to obtain entry. Liberty Lakes ###-####. Phone #: ###-#### Inspection requested via web by Krista Boss
|
MEC17-05675
| Pressure Test | 1/5/2018 | 1/5/2018 | 1/5/2018 2:05:58 PM | P | PASS |
|
|
60lb gas pass whole system
|
MEC18-00063
| Final | 1/4/2018 | 1/5/2018 | 1/5/2018 1:58:45 PM | P | FAIL |
|
|
Inspection requested via web by Margie Rowe- need right size fuses at disconnect
|
MEC18-00077
| Rough-in | 1/5/2018 | 1/5/2018 | 1/5/2018 1:48:22 PM | P | PART |
|
|
Oleg Phone #: ###-####- need supply register in kitchen B units- range hood duct or ventless??
|
MEC18-00078
| Rough-in | 1/5/2018 | 1/5/2018 | 1/5/2018 1:47:29 PM | P | NR |
|
|
MEC Phone #: ###-#### Inspection requested via web by Oleg Chervak- need supply register in kitchen B units- need nail plates on dryer duct all units- range hood duct ventless???
|
MEC18-00082
| Rough-in | 1/5/2018 | 1/5/2018 | 1/5/2018 1:46:28 PM | P | NR |
|
|
Oleg Phone #: ###-####- need supply register in kitchen B units- need nail plates on dryer duct all units- range Hood? ventless?
|
MEC18-00079
| Rough-in | 1/5/2018 | 1/5/2018 | 1/5/2018 1:45:14 PM | P | NR |
|
|
Oleg Phone #: ###-####- still installing
|
MEC16-05526
| Mec-Aging Inspection | 1/5/2018 | 1/5/2018 | 1/5/2018 12:32:18 PM | | FAIL |
|
|
no call for R/I or final inspection
|
MEC17-05762
| Final | 1/3/2018 | 1/5/2018 | 1/5/2018 11:36:48 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ron Arnold- furnace CO ok
|
MEC17-05812
| Final | 1/3/2018 | 1/5/2018 | 1/5/2018 11:22:41 AM | A | PASS |
|
|
Please call Judy with a 30 min call prior to arrival Phone #: ###-#### Inspection requested via web by Andrea Grigsby- mini split ok
|
MEC18-00068
| Final | 1/4/2018 | 1/5/2018 | 1/5/2018 10:52:47 AM | A | PASS |
|
|
Robert Phone #: ###-####
|
MEC17-02123
| Mec-Aging Inspection | 1/5/2018 | 1/5/2018 | 1/5/2018 10:51:25 AM | | PEND |
|
|
contractor will schedule final per phone call
|
MEC18-00060
| Final | 1/4/2018 | 1/5/2018 | 1/5/2018 10:40:01 AM | A | FAIL |
|
|
Inspection requested via web by Margie Rowe- eed right size fuses in disconnect outside
|
MEC17-05675
| Pressure Test | 1/4/2018 | 1/5/2018 | 1/5/2018 10:25:20 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by PATTY KIRK- gauge at 3 psi- need to attach piping to all roof stands- please have contractor meet me onsite for next inspection
|
MEC17-02216
| Rough-in | 1/4/2018 | 1/5/2018 | 1/5/2018 9:54:17 AM | A | PASS |
|
|
cover inspection - call Luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- bldg 300 ok for ceiling tiles to be installed- duct and flex all good
|
MEC18-00061
| Final | 1/4/2018 | 1/5/2018 | 1/5/2018 9:32:11 AM | A | FAIL |
|
|
Please call Kathryn prior to install ###-#### Inspection requested via web by Margie Rowe- need right size fuses in disconnect- need to seal lineset penetration outside- need to level thermostat- need permit pulled for exhaust fan in bathroom-
|
MEC18-00066
| Rough-in | 1/4/2018 | 1/5/2018 | 1/5/2018 9:03:42 AM | A | PART |
|
|
rough-in for shell - call jeremy Phone #: ###-#### Inspection requested via web by Brandon Sorensen- seal and ducting ok- need to verify all materials in plenum is rated for installation-
|
MEC18-00067
| Rough-in | 1/4/2018 | 1/5/2018 | 1/5/2018 9:02:59 AM | A | PART |
|
|
cover inspection - call jeremy Phone #: ###-#### Inspection requested via web by Brandon Sorensen- duct and sealing ok- need to verify all materials in plenum need to be rated material
|
MEC17-05762
| Final | 1/3/2018 | 1/5/2018 | 1/3/2018 9:36:22 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Ron Arnold Inspection cancelled from web by: Ron Arnold
|