BLD17-03967
| BLD-Footing | 1/4/2018 | 1/5/2018 | 1/5/2018 3:35:32 PM | P | PASS |
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD17-03968
| BLD-Footing | 1/4/2018 | 1/5/2018 | 1/5/2018 3:35:22 PM | P | PASS |
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD17-04212
| BLD-Foundation | 1/4/2018 | 1/5/2018 | 1/5/2018 3:35:10 PM | P | PART |
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD17-03986
| BLD-Foundation | 1/4/2018 | 1/5/2018 | 1/5/2018 3:34:59 PM | P | PART |
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD17-00268
| BLD-Final | 1/5/2018 | 1/5/2018 | 1/5/2018 2:39:51 PM | P | PASS |
|
|
Cory Phone #: ###-####
|
BLD17-04191
| BLD-Framing/Rough-in | 1/5/2018 | 1/5/2018 | 1/5/2018 2:04:39 PM | P | PASS |
|
|
If front door locked, keypad to right of door. CODE: 1912# Phone #: ###-#### Inspection requested via web by Brandon Schmeckpeper. Interior steel stud framed walls, 1st. floor only ok.
|
BLD16-04464
| BLD-Other | 1/5/2018 | 1/5/2018 | 1/5/2018 1:26:11 PM | P | PASS |
|
|
Sam-fire rated assembly Phone #: ###-####. 2 layers 5/8 type x at soffit ok.
|
BLD17-03734
| BLD-Framing/Rough-in | 1/4/2018 | 1/5/2018 | 1/5/2018 12:00:26 PM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Tom Wells. Plumbing rough in inspection failed. Install the additional SDS screws on LVL's as shown on approved plans Provide additional studs, both ends of FG01 2ply truss. Roll block floor joist at cantilever on garage wall. provide blocking on interior shaer wall, 2nd floor, by stairs. Justify pluming penetrations on fllor joist at garage and above bathroom by stairs.9 Only pre punch allowed with in six inches at end of floor joist. Install the floor to floor holdown as shown on the plans. Correction notice posted.
|
BLD17-03969
| BLD-Framing/Rough-in | 1/4/2018 | 1/5/2018 | 1/5/2018 11:55:24 AM | A | NR |
|
|
After 10 am please. Phone #: ###-#### Inspection requested via web by Tom Wells. Needs plumbing rough in inspection.
|
BLD17-01166
| BLD-Final | 1/4/2018 | 1/5/2018 | 1/5/2018 10:46:48 AM | A | PART |
|
|
part final- Cecil Phone #: ###-####. Rooms 209 and 210 ok to occupy.
|
BLD17-04006
| BLD-Final | 1/4/2018 | 1/5/2018 | 1/5/2018 10:20:07 AM | A | PASS |
|
|
call on your way - DJ Phone #: ###-####
|
BLD17-04006
| DOC - Permit Finaled | 1/5/2018 | 1/5/2018 | 1/5/2018 10:19:59 AM | P | PASS |
|
|
|
BLD17-02429
| BLD-Footing | 1/4/2018 | 1/5/2018 | 1/5/2018 10:02:30 AM | A | PASS |
|
|
Concrete is scheduled for 11am Phone #: ###-#### Inspection requested via web by Marty Short
|
BLD17-02707
| BLD-Final | 1/4/2018 | 1/5/2018 | 1/5/2018 9:23:44 AM | A | PASS |
|
|
Tim Phone #: ###-####. All issues were resolved. Ok for perm occ.
|
BLD17-03755
| BLD-Framing/Rough-in | 1/4/2018 | 1/5/2018 | 1/5/2018 8:55:55 AM | A | PART |
|
|
Contact is JP ###-#### Phone #: ###-#### Inspection requested via web by Mattie Botero. Interior wood framed walls and soffits for phase 2 ok, pend. electrical rough in inspection.
|
BLD17-00554
| BLD-Framing/Rough-in | 1/4/2018 | 1/5/2018 | 1/5/2018 8:36:41 AM | A | PASS |
|
|
Thanks. Scott Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD17-00554
| BLD-Energy code compliance | 1/5/2018 | 1/5/2018 | 1/5/2018 8:36:33 AM | A | PASS |
|
|
Thanks. Scott Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD17-04513
| BLD-Final | 1/2/2018 | 1/5/2018 | 1/5/2018 12:00:00 AM | A | CANC |
|
|
Enter through back parking lot- Larren Phone #: ###-####
|