PLM00-00027
| Plumbing Rough-in | 1/5/2000 | 1/6/2000 | 1/6/2000 12:00:00 AM | A | FAIL |
|
|
###-####. Needs testing and nail plates.
|
PLM99-04130
| Final | 1/6/2000 | 1/6/2000 | 1/6/2000 12:00:00 AM | P | PASS |
|
|
gary ###-####. Final ok.
|
PLM00-00032
| Water and/or Sewer | 1/6/2000 | 1/6/2000 | 1/6/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/06/2000 at 10:41:52. Contact: ###-####. Install piping.
|
PLM99-03860
| Final | 1/6/2000 | 1/6/2000 | 1/6/2000 12:00:00 AM | P | PART |
|
|
Part. final ok, temp. occ. ok, turn down vacuum exhaust, pipe med air makeup to attic space, use approved material in med. air system, verify filter indicator adiquately.
|
PLM99-03482
| Plumbing Rough-in | 1/5/2000 | 1/6/2000 | 1/6/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/05/2000 at 13:00:26. Contact: ###-####. Part R/I ok- ok to cover- needs expantion tank and backgraded at waste connection to exsiting.
|