BLD02-00758
| BLD-Aging Inspection | 1/6/2003 | 1/6/2003 | 1/6/2003 12:00:00 AM | | FAIL |
|
|
ubc 106.4.4 1/6/2003 7:54:25 AM
|
BLD02-00767
| BLD-Aging Inspection | 1/6/2003 | 1/6/2003 | 1/6/2003 12:00:00 AM | | FAIL |
|
|
ubc 106.4.4 1/6/2003 7:54:12 AM
|
BLD02-02495
| BLD-Energy code compliance | 1/3/2003 | 1/6/2003 | 1/6/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/03/2003 at 12:24:42. Contact: ###-####. ft at front porch stil missing needs insp. 1/6/2003 3:15:20 PM
|
BLD02-02922
| BLD-Framing/Rough-in | 1/3/2003 | 1/6/2003 | 1/6/2003 12:00:00 AM | A | PART |
|
|
john--fire wall insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie fire wall interior gyp nailling ok blow patch at garage wall ok due to berrior post at furnce restricking flat wall assemblie. ok 1/6/2003 9:00:31 AM
|
BLD02-01958
| BLD-Framing/Rough-in | 1/6/2003 | 1/6/2003 | 1/6/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/06/2003 at 08:48:08. Contact: ###-####. ceilling ok to gyp. 1/6/2003 5:15:13 PM
|
BLD02-02769
| BLD-Conference | 1/6/2003 | 1/6/2003 | 1/6/2003 12:00:00 AM | P | PART |
|
|
###-#### ###-####roof framing ok 80 % 1/6/2003 3:54:50 PM
|
BLD02-02926
| BLD-Footing | 1/6/2003 | 1/6/2003 | 1/6/2003 12:00:00 AM | P | PASS |
|
|
###-####
|