PLM03-03223
| Final | 1/5/2004 | 1/6/2004 | 1/6/2004 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 1/5/2004 at 11:33:31 AM. Contact: ###-####. open cabinets under soda mech. and coffee make extend toe kick around f.s. and seal, test all backflow preventors, install strainers and grates at all f.s., calk janitor sink, repair floor and calk wc, airgap prep sink waste. 1/6/2004 10:07:10 AM
|
PLM03-03870
| Final | 1/5/2004 | 1/6/2004 | 1/6/2004 12:00:00 AM | A | PASS |
|
|
call 1st before insp brett- ###-#### cell final ok 1/6/2004 10:18:28 AM
|
PLM02-00800
| Final | 1/5/2004 | 1/6/2004 | 1/6/2004 12:00:00 AM | A | PASS |
|
|
already done-received cert of comp pamela- ###-####
|
PLM04-00014
| Water and/or Sewer | 1/5/2004 | 1/6/2004 | 1/6/2004 12:00:00 AM | A | PASS |
|
|
von ###-#### sw final ok 1/6/2004 9:19:40 AM
|
PLM03-03821
| Final | 1/6/2004 | 1/6/2004 | 1/6/2004 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 1/6/2004 at 9:48:10 AM. Contact: ###-####. set water supplied tanning equipment, trun t&p drain down. temp occ ok 1/6/2004 2:24:49 PM
|
PLM04-00015
| Water and/or Sewer | 1/6/2004 | 1/6/2004 | 1/6/2004 12:00:00 AM | P | PART |
|
|
conference on not enough grade, lets shot grade before we get too carried away 1/7/2004 9:53:57 AM
|
PLM04-00018
| Plumbing Rough-in | 1/5/2004 | 1/6/2004 | 1/6/2004 12:00:00 AM | P | PART |
|
|
###-#### robert ok to cover walls just needs water softenor loop. 1/6/2004 2:25:26 PM
|
PLM04-00019
| Plumbing Rough-in | 1/5/2004 | 1/6/2004 | 1/6/2004 12:00:00 AM | P | PART |
|
|
Robert ###-#### ok to cover walls just needs water softenor loop. 1/6/2004 2:25:48 PM
|