Inspections for the day of: Tuesday, January 6, 2004.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM03-03223 Final1/5/20041/6/20041/6/2004 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 1/5/2004 at 11:33:31 AM. Contact: ###-####. open cabinets under soda mech. and coffee make extend toe kick around f.s. and seal, test all backflow preventors, install strainers and grates at all f.s., calk janitor sink, repair floor and calk wc, airgap prep sink waste. 1/6/2004 10:07:10 AM
PLM03-03870 Final1/5/20041/6/20041/6/2004 12:00:00 AMAPASS
call 1st before insp brett- ###-#### cell final ok 1/6/2004 10:18:28 AM
PLM02-00800 Final1/5/20041/6/20041/6/2004 12:00:00 AMAPASS
already done-received cert of comp pamela- ###-####
PLM04-00014 Water and/or Sewer1/5/20041/6/20041/6/2004 12:00:00 AMAPASS
von ###-#### sw final ok 1/6/2004 9:19:40 AM
PLM03-03821 Final1/6/20041/6/20041/6/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 1/6/2004 at 9:48:10 AM. Contact: ###-####. set water supplied tanning equipment, trun t&p drain down. temp occ ok 1/6/2004 2:24:49 PM
PLM04-00015 Water and/or Sewer1/6/20041/6/20041/6/2004 12:00:00 AMPPART
conference on not enough grade, lets shot grade before we get too carried away 1/7/2004 9:53:57 AM
PLM04-00018 Plumbing Rough-in1/5/20041/6/20041/6/2004 12:00:00 AMPPART
###-#### robert ok to cover walls just needs water softenor loop. 1/6/2004 2:25:26 PM
PLM04-00019 Plumbing Rough-in1/5/20041/6/20041/6/2004 12:00:00 AMPPART
Robert ###-#### ok to cover walls just needs water softenor loop. 1/6/2004 2:25:48 PM