BLD03-02350
| BLD-Framing/Rough-in | 1/5/2004 | 1/6/2004 | 1/6/2004 12:00:00 AM | A | CANC |
|
|
Travis; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
MEC03-03686
| Pressure Test | 1/5/2004 | 1/6/2004 | 1/6/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 1/5/2004 at 5:28:14 PM. Contact: ###-####.
|
MEC03-03685
| Pressure Test | 1/5/2004 | 1/6/2004 | 1/6/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/5/2004 at 5:30:23 PM. Contact: ###-####.
|
BLD03-02431
| BLD-Framing/Rough-in | 1/6/2004 | 1/6/2004 | 1/6/2004 12:00:00 AM | P | PASS |
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD03-02533
| BLD-Framing/Rough-in | 1/5/2004 | 1/6/2004 | 1/6/2004 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 1/5/2004 at 4:54:21 PM. Contact: ###-####. need to complete oposite side of wall (south). 1/6/2004 4:28:42 PM
|