PLM04-03084
| Final | 1/5/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | A | PASS |
|
|
randall ###-####
|
PLM05-00008
| Water and/or Sewer | 1/5/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | A | NR |
|
|
|
PLM05-00009
| Water and/or Sewer | 1/5/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | A | PASS |
|
|
|
PLM04-03863
| Plumbing Rough-in | 1/5/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | A | FAIL |
|
|
Internet Inspection Request from: Kim Alderson test failed on D.W.V. and water talked to plumber on job site will recall when ready 1/6/2005 9:26:16 AM
|
PLM05-00007
| Water and/or Sewer | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | PASS |
|
|
###-#### holly
|
PLM04-02888
| Final | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | PASS |
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
PLM05-00008
| Water and/or Sewer | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | PASS |
|
|
|
PLM04-03863
| Plumbing Rough-in | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | FAIL |
|
|
Reinspection Internet Inspection Request from: Kim Alderson test failed on D.W.V. water test ok contractor to recall when ready 1/6/2005 1:32:54 PM
|
PLM04-03164
| Final | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | PASS |
|
|
gene; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
PLM04-03221
| Final | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | PASS |
|
|
gene; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
PLM05-00044
| Plumbing Rough-in | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | PART |
|
|
leo- ###-#### need to run softner drain,s in both unit,s and terminate one inch above flood level rim of washer box. correct san tee for vent in down staires bathroom in unit 8537 installed backward,s nail plate above tub in unit 8537 left correction notice contractor to recall when ready 1/6/2005 2:43:21 PM 1/6/2005 2:44:19 PM
|
PLM04-03155
| Plumbing Rough-in | 1/4/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | FAIL |
|
|
Pete; Phone #: ###-#### Internet Inspection Request from: Jan Rice submit stamped drawing of exiterior installation of premise backflow valve in accorandance with pacific northwest A.W. W, A. cross-connection control manual sixth edition chapter 7 page 10 & 12 or alteranate option : just install backflow premise valve inside building 1/7/2005 10:07:13 AM
|
PLM04-03134
| Plumbing Rough-in | 1/4/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | PART |
|
|
Pete; Phone #: ###-#### Internet Inspection Request from: Jan Rice roof and overflow drain,s test ok for premise protection rough-in see note under permit # plm04-03155 1/7/2005 10:11:44 AM 1/7/2005 10:12:32 AM
|
PLM04-03089
| Plumbing Rough-in | 1/4/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | PART |
|
|
Pete; Phone #: ###-#### Internet Inspection Request from: Jan Rice roof and overflow drain,s test ok for premise protection rough-in see note under permit # plm04-03155 1/7/2005 10:10:03 AM 1/7/2005 10:12:08 AM
|