FIR04-00177
| INSP-Final Inspection | 1/5/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | A | FAIL |
|
|
Internet Inspection Request from: James Shilton Need maunaul pulls at exits from dining areas; two duct detectors were added for the AHU 1/6/2005 11:13:46 AM
|
FIR04-00647
| INSP-Final Inspection | 1/5/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | A | PART |
|
|
Rick, This is for Phase I only. Jim Internet Inspection Request from: James Shilton North office area only okay; EOL relocated and addresses changed - as-builts provided to reflect changes 1/6/2005 11:16:06 AM
|
FIR04-00724
| INSP-Sprinkler Rough-in | 1/5/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | A | PART |
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Completed on 1/5/05 - okay to cover 1/6/2005 11:07:49 AM
|
BLD04-00702
| FIRE-Final Inspection | 1/5/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | A | NR |
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore The man door near the loading dock has been deleted and per architect resubmittals are being turned in to plan review to verify exiting and exit signs 1/6/2005 2:28:43 PM
|
FIR04-00771
| INSP-Sprinkler Rough-in | 1/5/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | A | PART |
|
|
mike; Phone #: ###-#######-#### Internet Inspection Request from: Marsha Smylie Okay to cover hard lid area only 1/6/2005 11:25:01 AM
|
BLD04-01783
| FIRE-Final Inspection | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | A | FAIL |
|
|
Need Hazmat report as requested on approved fire code plan review notes 1/6/2005 11:12:16 AM
|
FIR04-00394
| INSP-Final Inspection | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | A | FAIL |
|
|
Need auxiliary sign on drain in mechanical room 1/6/2005 11:15:01 AM
|
FIR04-00720
| INSP-Final Inspection | 1/5/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | A | PASS |
|
|
Internet Inspection Request from: James Shilton The strobe indicated on approved plans that should be shifted to the north does not need to be moved as equipement takes up occupiable space 1/6/2005 11:11:21 AM
|
BLD04-02664
| FIRE-Final Inspection | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | PASS |
|
|
Fire/life safety final okay 1/6/2005 2:27:03 PM
|
BLD04-00702
| FIRE-Final Inspection | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | PART |
|
|
Temp occupancy approved for fire per Sam R.; awaiting completion of both fire sprinkler permits and resubmittals for fire alarm zone changes 1/6/2005 4:00:19 PM
|
FIR04-00784
| INSP-Final Inspection | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/6/2005 at 7:47:02 AM. Contact: ###-####.
|
BLD04-01817
| FIRE-Sprinkler Rough-in | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | NR |
|
|
bob ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need approved plans 1/6/2005 4:36:45 PM
|
FIR04-00673
| INSP-Alarm Testing | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | PART |
|
|
dan - Note: check 4 smoke dectors in 2 apts; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Rooms 921 and 921 1/2 tested okay 1/6/2005 2:45:32 PM
|
FIR04-00177
| INSP-Sprinkler Rough-in/Hydro | 1/5/2005 | 1/6/2005 | 1/5/2005 12:41:12 PM | A | CANC |
|
|
Internet Inspection Request from: James Shilton Inspection cancelled from web by: James Shilton
|