BLD04-02777
| FIRE-Final Inspection | 1/5/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | A | CANC |
|
|
11?? larry; Phone #: ###-#### Per Larry they are not ready yet. 1/6/2005 11:35:06 AM
|
FIR04-00714
| INSP-Final Inspection | 12/30/2004 | 1/6/2005 | 1/6/2005 12:00:00 AM | A | CANC |
|
|
Rescheduled for afternoon 1/6/2005 9:17:46 AM
|
FIR04-00778
| INSP-Final Inspection | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | A | FAIL |
|
|
Insulation backing previously attached to the deck at the new wall is hanging down and blocking upright head coverage. This is on the go-kart side of the wall. I notified Larry in Emser Tile of this.
|
FIR03-00012
| INSP-Final Inspection | 1/5/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | FAIL |
|
|
Waterflow did not come into panel within 90 seconds 1/6/2005 1:11:38 PM
|
FIR04-00806
| INSP-Final Inspection | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | CANC |
|
|
Per hank the project is not ready 1/6/2005 1:59:48 PM
|
BLD04-02719
| FIRE-Final Inspection | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | FAIL |
|
|
Repair all of the exit signs 1/6/2005 3:54:16 PM
|
FIR04-00608
| INSP-Sprinkler Rough-in/Hydro | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | PART |
|
|
kerry -call 1st before insp ; Phone #: ###-#### Overhead hydro test for the canopy at Blockbuster and the DBSI canopy passed. Overhead hydro test for the canopy in front of Rite Aid failed. 1/6/2005 3:23:13 PM
|
FIR04-00714
| INSP-Final Inspection | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | PASS |
|
|
Hood suppression system operated correctly. One fryer has been removed 1/6/2005 4:08:39 PM
|
FIR04-00627
| INSP-Sprinkler Rough-in | 1/6/2005 | 1/6/2005 | 1/6/2005 12:00:00 AM | P | PART |
|
|
Underground supply piping is ok to cover from the roadway west to the steel stake 1/6/2005 2:47:17 PM
|