Inspections for the day of: Thursday, January 6, 2005.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-02777 FIRE-Final Inspection1/5/20051/6/20051/6/2005 12:00:00 AMACANC
11?? larry; Phone #: ###-#### Per Larry they are not ready yet. 1/6/2005 11:35:06 AM
FIR04-00714 INSP-Final Inspection12/30/20041/6/20051/6/2005 12:00:00 AMACANC
Rescheduled for afternoon 1/6/2005 9:17:46 AM
FIR04-00778 INSP-Final Inspection1/6/20051/6/20051/6/2005 12:00:00 AMAFAIL
Insulation backing previously attached to the deck at the new wall is hanging down and blocking upright head coverage. This is on the go-kart side of the wall. I notified Larry in Emser Tile of this.
FIR03-00012 INSP-Final Inspection1/5/20051/6/20051/6/2005 12:00:00 AMPFAIL
Waterflow did not come into panel within 90 seconds 1/6/2005 1:11:38 PM
FIR04-00806 INSP-Final Inspection1/6/20051/6/20051/6/2005 12:00:00 AMPCANC
Per hank the project is not ready 1/6/2005 1:59:48 PM
BLD04-02719 FIRE-Final Inspection1/6/20051/6/20051/6/2005 12:00:00 AMPFAIL
Repair all of the exit signs 1/6/2005 3:54:16 PM
FIR04-00608 INSP-Sprinkler Rough-in/Hydro1/6/20051/6/20051/6/2005 12:00:00 AMPPART
kerry -call 1st before insp ; Phone #: ###-#### Overhead hydro test for the canopy at Blockbuster and the DBSI canopy passed. Overhead hydro test for the canopy in front of Rite Aid failed. 1/6/2005 3:23:13 PM
FIR04-00714 INSP-Final Inspection1/6/20051/6/20051/6/2005 12:00:00 AMPPASS
Hood suppression system operated correctly. One fryer has been removed 1/6/2005 4:08:39 PM
FIR04-00627 INSP-Sprinkler Rough-in1/6/20051/6/20051/6/2005 12:00:00 AMPPART
Underground supply piping is ok to cover from the roadway west to the steel stake 1/6/2005 2:47:17 PM