Inspections for the day of: Friday, January 6, 2006.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-02816 FIRE-Final Inspection1/6/20061/6/20061/6/2006 4:02:50 PMPNR
jerry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore The related fire alarm permit must pass inspection prior to life safety final.
FIR05-00849 INSP-Final Inspection1/6/20061/6/20061/6/2006 4:01:09 PMPFAIL
Addressing at two smoke detectors does not match between map and panel for correct location, EOL voltage is too low for min. requirements on battery backup, cd rating at one strobe in the open area has been changed from a 60 as shown on approved plans to a 110.
BLD05-02317 FIRE-Final Inspection1/5/20061/6/20061/6/2006 2:59:44 PMPNR
Related work including the restrooms and rated exit corridor must be completed per city approved plan and review notes prior to final as indicated on previous correction notice, not ready for final at this time per conversation with Jeff.
BLD02-02566 FIRE-Conference1/6/20061/6/20061/6/2006 2:24:19 PMPDONE
On site discussion regarding exiting requirements and door hardware issues.
FIR05-00746 INSP-Sprinkler Rough-in/Hydro1/6/20061/6/20061/6/2006 1:05:07 PMPPART
Overhead rough-in is good for cover at the lobby, kitchen, corridor ,confrence and reception areas, two upright heads above drop ceiling at the market room need to be removed as indicated on plans, one upright head in the staff laundry is painted, need to verify enclosed space at the end of meeting room as marked on plans is noncombustible or sprinklered, rotate aux. drain for antifreeze system to the lowest portion of the pipe, provide flex coupling at the top of riser, need to complete seismic bracing.
FIR05-00902 INSP-Final Inspection1/5/20061/6/20061/6/2006 11:38:26 AMAPASS
Fire sprinkler permit finaled.
FIR05-00851 INSP-Final Inspection1/5/20061/6/20061/6/2006 10:54:05 AMPPART
Overhead sprinkler rough-in is good for cover, will final permit when ceiling tile and escutcheons are installed.
BLD05-02662 FIRE-Final Inspection1/5/20061/6/20061/6/2006 10:26:30 AMPPASS
Items on c/n are complete, fire life safety passed inspection.
BLD05-01715 FIRE-Final Inspection1/5/20061/6/20061/6/2006 10:25:37 AMPPASS
Items on c/n are complete, fire life safety finaled.
FIR05-00778 INSP-Final Inspection1/6/20061/6/20061/6/2006 10:23:27 AMAPASS
Corrections have been made, fire sprinkler finaled.
FIR05-00744 INSP-Final Inspection1/6/20061/6/20061/6/2006 10:21:31 AMAPASS
Fire sprinkler demo passed.
BLD05-03075 FIRE-Final Inspection1/5/20061/6/20061/6/2006 8:50:59 AMAPASS
Fire life safety is acceptable.
FIR05-00848 INSP-Final Inspection1/5/20061/6/20061/6/2006 8:47:57 AMAPASS
Required corrections have been completed, fire alarm permit finaled.
FIR05-00868 INSP-Final Inspection1/6/20061/6/20061/6/2006 8:46:19 AMPPASS
The required corrections have been made, fire sprinkler passed inspection.