Inspections for the day of: Friday, January 6, 2006.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAimee Hughes
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC05-01898 Complaint Inspection1/6/20061/6/20061/6/2006 2:22:29 PMPFAIL
Responded to complaint from ACHD. met with RP to discuss bmp installation. c/n issued to address straw wattle placement, inadequate construction entrance and d/i protection. must be completed by end of weekend or a stop work may be issued. will follow up.
ESC05-01297 Tracking Control12/16/20051/6/20061/6/2006 11:30:27 AMAPASS
Site looks okay. All bmp's are being maintained.
ESC05-01391 Tracking Control12/16/20051/6/20061/6/2006 11:29:51 AMAPASS
Site looks good. all bmp's are being maintained.
ESC05-01112 Tracking Control12/16/20051/6/20061/6/2006 11:29:18 AMAPASS
Site looks okay...all bmp's are being maintained.