Inspections for the day of: Tuesday, January 6, 2009.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00922 General Inspection1/6/20091/6/20091/6/2009 4:01:05 PMPPASS
looked ok
ESC06-01299 General Inspection1/6/20091/6/20091/6/2009 3:21:36 PMPPASS
looked ok, lot of snow on deck
ESC08-00704 General Inspection1/6/20091/6/20091/6/2009 2:34:33 PMPPASS
looked ok, too much snow
ELE08-00407 Electrical Rough-In1/6/20091/6/20091/6/2009 1:48:45 PMPFAIL
JOE NOTE: CEILING COVER Phone #: ###-#### met contractor, left correction notice, NEC 300.22(B) only wiring methods shall be used as listed for plenum wiring,820, 770, 800.154, 760 and applicable articles shall be followed, BCC no violations shall be retained
ELE08-02992 Final1/6/20091/6/20091/6/2009 12:55:23 PMPFAIL
Phone #: ###-#### Internet Inspection Request from: Therrin Robertson corrections except for fixtures made, called, contractor will call back when can show listing on fixtures
ESC07-00876 General Inspection1/6/20091/6/20091/6/2009 11:52:28 AMAPASS
could not see dirt, too much snow, looked ok
ELE07-03307 Final1/5/20091/6/20091/6/2009 10:58:31 AMACANC
Contact: Neil Ramsey - Rough-in elevator fronts 9,10,11 & 12 Phone #: ###-#### Internet Inspection Request from: Deb Gooden wrong type request, see ri
ELE07-03307 Electrical Rough-In1/6/20091/6/20091/6/2009 10:38:00 AMAPASS
Contact: Neil Ramsey - Rough-in elevator fronts 9,10,11 & 12 Phone #: ###-#### Internet Inspection Request from: Deb Gooden ok to cover elevator fronts floor 9, 10, 11, and 12
ELE08-00407 Conference1/5/20091/6/20091/6/2009 10:10:03 AMADONE
joe Phone #: ###-#### met contractor, snf common area is return air duct, told contractor no grandfather clause applies, that all cabling shall be plenum rated cable
ELE08-02755 Final1/5/20091/6/20091/6/2009 9:22:58 AMANR
The tellers at the front door will let you into the back area Phone #: ###-#### Internet Inspection Request from: David Nelson called contractor, told that panel must be closed, panel schedule complete, receptacles work, and be tight in wall, ceiling to be opened for inspection of seismic wires etc, fee due
ELE09-00007 Electrical Rough-In1/6/20091/6/20091/6/2009 8:38:47 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Jim Williams walls only ok to cover, no esc this project