FIR07-00827
| INSP-Sprinkler Rough-in | 1/6/2009 | 1/6/2009 | 1/6/2009 6:24:04 PM | P | PART |
|
|
Coverage to be adjusted at two obstructed pockets per discussion.
|
FIR08-00681
| INSP-Final Inspection | 1/6/2009 | 1/6/2009 | 1/6/2009 6:21:20 PM | P | PASS |
|
|
Scope of demo work per permit documents is complete, final okay.
|
BLD08-02227
| FIRE-Final Inspection | 1/6/2009 | 1/6/2009 | 1/6/2009 6:20:17 PM | P | PASS |
|
|
Reinspection for correction items passed, fire life safety finaled.
|
FIR08-00605
| INSP-Sprinkler Rough-in/Hydro | 1/5/2009 | 1/6/2009 | 1/6/2009 6:19:13 PM | A | NR |
|
|
Tenting and insulation not yet completed per conversation with contractor.
|
FIR08-00671
| INSP-Sprinkler Rough-in | 1/5/2009 | 1/6/2009 | 1/6/2009 6:17:45 PM | A | PART |
|
|
Fire sprinkler system modifications at two cloud ceilings, the electrical room and riser room are acceptable.
|