MIS10-00004
| BLD-Conference | 1/6/2010 | 1/6/2010 | 1/6/2010 4:17:46 PM | P | DONE |
|
|
Complaint of working w/out permits on new tenant remodel. STOP WORK ORDER ISSUED. Notified Bob Archibald. Moving walls and electrical. Moving lighting and installing new walls. Notice posted on window by front entry door.
|
BLD09-02149
| BLD-Framing/Rough-in | 1/5/2010 | 1/6/2010 | 1/6/2010 4:09:37 PM | P | PART |
|
|
Matt Phone #: ###-#### OK to cover interior walls except area that needs a door opening (at hallway)....that is shown on approved plan. Need to reinspect door opening and inspect 2 hr wall.
|
ESC09-00736
| Site Preparation | 1/6/2010 | 1/6/2010 | 1/6/2010 4:05:21 PM | P | NR |
|
|
Need to complete landscaping.
|
BLD09-01200
| BLD-Final | 1/5/2010 | 1/6/2010 | 1/6/2010 4:04:17 PM | P | PASS |
|
|
Dan Phone #: ###-#### C/C issued.
|
BLD09-01200
| DOC - Permit Finaled | 1/6/2010 | 1/6/2010 | 1/6/2010 4:03:56 PM | P | PASS |
|
|
|
BLD09-02057
| BLD-Other | 1/5/2010 | 1/6/2010 | 1/6/2010 4:03:26 PM | A | PASS |
|
|
stem wall // Bill Phone #: ###-####
|