ELE09-01492
| ELE-Aging Inspection | 1/6/2010 | 1/6/2010 | 1/8/2010 4:01:58 PM | | DONE |
|
|
no activity, suc
|
ELE08-01224
| ELE-Aging Inspection | 1/6/2010 | 1/6/2010 | 1/7/2010 4:10:16 PM | | DONE |
|
|
no activity, see doc expire
|
ELE09-00479
| Final | 1/6/2010 | 1/6/2010 | 1/6/2010 4:30:35 PM | P | PASS |
|
|
Code for gate is *2 4 6 8 and code for garage door is 1744 enter Phone #: ###-#### Internet Inspection Request from: Jim Williams called contractor, ok to final
|
ESC08-00809
| General Inspection | 1/6/2010 | 1/6/2010 | 1/6/2010 3:59:50 PM | P | PASS |
|
|
looked ok
|
ESC09-00798
| General Inspection | 1/6/2010 | 1/6/2010 | 1/6/2010 3:58:50 PM | P | PASS |
|
|
looked ok
|
ESC09-00723
| General Inspection | 1/6/2010 | 1/6/2010 | 1/6/2010 3:58:10 PM | P | PASS |
|
|
looked ok
|
ESC09-00138
| General Inspection | 1/6/2010 | 1/6/2010 | 1/6/2010 3:57:28 PM | P | PASS |
|
|
looked ok
|
ELE09-02161
| Final | 1/6/2010 | 1/6/2010 | 1/6/2010 3:53:45 PM | P | PASS |
|
|
This is a final for the addition at Inn America Phone #: ###-#### Internet Inspection Request from: Spencer Mclean survey for showroom receptacles per NEC 210.63, ok to final
|
ELE10-00020
| Temporary Service | 1/6/2010 | 1/6/2010 | 1/6/2010 3:22:07 PM | P | PASS |
|
|
Dino Phone #: ###-#### called, t/s u/g n ok
|
ELE10-00018
| Electrical Rough-In | 1/6/2010 | 1/6/2010 | 1/6/2010 2:24:32 PM | P | PASS |
|
|
Please call 1/2 hr ahead for access Phone #: ###-#### Internet Inspection Request from: Terry Scott ok to cover 3 roms, no esc this project
|
ELE09-01997
| Rough-In Permanent Service | 1/6/2010 | 1/6/2010 | 1/6/2010 1:03:30 PM | P | PASS |
|
|
First 20 units on North side of Bldg and hall ready for Rough-In. Thank you!! On site - Gene ###-####. Phone #: ###-#### Internet Inspection Request from: Tracy Robertson ok to cover units anop
|
ELE09-02232
| Electrical Rough-In | 1/5/2010 | 1/6/2010 | 1/6/2010 11:06:47 AM | A | PASS |
|
|
Cover kitchen - electrician Luke ###-#### Phone #: ###-#### Internet Inspection Request from: Dave Koeppen ok cover kitchen only
|
ELE09-02296
| Electrical Rough-In | 1/5/2010 | 1/6/2010 | 1/6/2010 10:41:37 AM | A | PASS |
|
|
Downstairs Bathroom Electrical Rough-in. Phone #: ###-#### Internet Inspection Request from: MIKE HAGERTY ok to cover downstair bath, shower area, no esc this project
|
ELE09-02284
| Electrical Rough-In | 1/5/2010 | 1/6/2010 | 1/6/2010 10:07:48 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Bryan McLaughlin ok to cover ceiling, no esc this project
|
GCE09-00049
| GCE-Rough-In | 1/5/2010 | 1/6/2010 | 1/6/2010 9:48:48 AM | A | PASS |
|
|
contact Hume @ ###-#### ri ok, will call for service later, no esc this project
|
ELE09-00466
| ELE-Request for Extension | 1/5/2010 | 1/6/2010 | 1/6/2010 8:53:07 AM | A | PASS |
|
|
HE IS HAVING FAMILY MEDICAL PROBLEMS..PLEASE EXTEND PERMIT called office to extend permit, ok, no esc this project
|
ELE09-02245
| Conference | 1/5/2010 | 1/6/2010 | 1/6/2010 8:50:29 AM | A | DONE |
|
|
Bob,If possible Micron would like to talk to you about our Emergency systems in our buildings and make sure we are in compliance with what the NEC says and the City of Boise is requiring. Phone #: ###-#### Internet Inspection Request from: Paul Cook called, told paul that ok to add load to existing emergency system since city doesn't regulate the system as far as required emergency or optional stand-by system or system for industrial processes. Said that they would be able to determine needed loads on the existing system. no esc this project
|
ELE09-00466
| Extend Permit 180 days | | 1/6/2010 | 1/6/2010 12:00:00 AM | | DONE |
|
|
|