ESC09-00738
| Site Preparation | 1/6/2010 | 1/6/2010 | 1/6/2010 4:02:58 PM | | PART |
|
|
Tracking found on the hard surfaces surrounding the project. Will be cleaned up by the contractor at the end of the day. Will re-inspect on 1/8/09PM.
|
ESC09-00173
| Site Preparation | 1/6/2010 | 1/6/2010 | 1/6/2010 3:04:59 PM | | NR |
|
|
|
ESC09-00507
| BMP Violation | 1/4/2010 | 1/6/2010 | 1/6/2010 3:01:32 PM | A | DONE |
|
|
Went over with Justin from Tuffy. Rcommend them to look at the option in addition to the sediment traps (that are list on the approved ESC plan ) to install a run off collection channel lined with filter fabric and rock to slow down velocity of the flow and also capturing sediment. Will re-inspect 1/7/10 am.
|
ESC08-00491
| Site Final | 1/5/2010 | 1/6/2010 | 1/6/2010 2:22:15 PM | A | CANC |
|
|
301
|
ESC09-00245
| Site Final | 1/5/2010 | 1/6/2010 | 1/6/2010 10:41:05 AM | A | PASS |
|
|
301
|
ESC09-00386
| General Inspection | 1/4/2010 | 1/6/2010 | 1/6/2010 9:36:00 AM | P | PART |
|
|
Waiting to recieve payment for all changes made to the permit.. Will re-inspect on 1/8/10.
|