ELE15-00023
| Electrical Rough-In | 1/6/2015 | 1/6/2015 | 1/6/2015 2:57:17 PM | P | PASS |
|
|
Wall rough-in inspection - contact is Robert Gates ###-#### Phone #: ###-#### Inspection requested via web by Scott Campbell Asked what type of fluid would be present, not sure at wall rough in time but believe no hazardous location should be present, working with plastics. Offices, panel shop, break room, pipe assembly room, compressor room, and plastic assembly room wall rough in ok cover.
|
ELE14-03322
| Final | 1/6/2015 | 1/6/2015 | 1/6/2015 2:19:12 PM | P | PASS |
|
|
Phone #: 6299948 >> Inspection requested via mobile web by David McClellan Final ok
|
ELE14-03559
| Final | 1/6/2015 | 1/6/2015 | 1/6/2015 1:48:30 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov Needed rough in permanant service inspection
|
ELE14-03559
| Rough-In Permanent Service | 1/6/2015 | 1/6/2015 | 1/6/2015 1:48:16 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov Rough in ok cover p/s u/g n ok
|
ELE14-03236
| Final | 1/6/2015 | 1/6/2015 | 1/6/2015 1:46:56 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov Have not started trimming units yet.
|
ELE15-00020
| Rough-In Permanent Service | 1/6/2015 | 1/6/2015 | 1/6/2015 1:05:48 PM | P | FAIL |
|
|
Contact Ben if any questions Phone #: ###-#### Inspection requested via web by Ben Archibald 210.52(G)(1)- Each garage space shall have a receptacle outlet installed for that space that shall be fed by a dedicated circuit that shall feed no other outlets. 300.4- Where bored holes are less than 1 1/4" from framing surface NM cable shall be protected from physical damage. 300.4(D)- NM cable shall not be secured less than 1 1/4" from framing surface. Stapling side by side on 2x4 studs. 334.40(A)- NM cable shall terminated in a box. entry christmas. 590.6(B)- Receptacle temporary outlets other than 120 volt shall have GFCI protection
|
ELE15-00017
| Final | 1/5/2015 | 1/6/2015 | 1/6/2015 11:07:23 AM | A | PASS |
|
|
Mark-please call for access Phone #: ###-#### Final ok
|
ELE15-00017
| Electrical Rough-In | 1/6/2015 | 1/6/2015 | 1/6/2015 11:06:57 AM | P | PASS |
|
|
Mark-please call for access Phone #: ###-#### heat pump rough in ok
|
ELE14-02213
| Electrical Rough-In | 1/5/2015 | 1/6/2015 | 1/6/2015 10:25:56 AM | A | PASS |
|
|
Mike Phone #: ###-#### Walls and hard lids south of dividing corridor except entry area. Ok to one side x-ray area if contractor wants to allow. Rough in ok cover
|
ELE14-02747
| Rough-In Permanent Service | 1/5/2015 | 1/6/2015 | 1/6/2015 9:31:04 AM | A | PASS |
|
|
Jason Phone #: ###-#### service for parking lot rough in ok p/s u/g n ok
|
ELE14-03542
| Rough-In Permanent Service | 1/5/2015 | 1/6/2015 | 1/6/2015 8:55:33 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Heath Thomas Rough in ok cover p/s u/g n ok
|
ELE14-03543
| Rough-In Permanent Service | 1/5/2015 | 1/6/2015 | 1/6/2015 8:35:22 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Heath Thomas Rough in ok cover p/s u/g n ok
|