Inspections for the day of: Tuesday, January 6, 2015.
Number of inspections: 12
Percentage of inspections complete: 92 %
Percentage of inspections not complete: 8 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00344 INSP-Sprinkler Rough-in12/29/201412/30/2014 P 
Inspection for 1st floor soffits area a and b. Contact is Raul ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Carter II
FIR13-00725 INSP-Sprinkler Rough-in1/5/20151/6/20151/8/2015 4:18:38 PMPPART
Completed rough-in inspection for the 3rd floor heilix- sheet FP 16. Refer to plans for dated annotations. Missing one hanger at 4" main.
FIR14-00261 INSP-Final Inspection12/30/20141/6/20151/6/2015 3:42:30 PMPPART
BLD14-01868 FIRE-Final Inspection1/6/20151/6/20151/6/2015 3:41:45 PMPNR
Need project related fire sprinkler permit work completion and final prior to BLD fire life safety approval.
FIR14-00659 INSP-Sprinkler Rough-in/Hydro1/5/20151/6/20151/6/2015 3:01:38 PMPPART
Overhead work approved for cover between grid lines 9 and 11 north end as noted on plans. Rough-in of new branchlines and main at the remainder of grid ceilings okayed. Final hydrostatic test to be finished once drops are installed, heads relocated and old sprinklers are replaced per the scope of work.
BLD14-01691 FIRE-Final Inspection1/6/20151/6/20151/6/2015 2:07:35 PMPNR
Need project related fire alarm and fire sprinkler permit work finaled prior to BLD fire life safety approval.
FIR14-00671 INSP-Sprinkler Rough-in/Hydro1/2/20151/6/20151/6/2015 2:05:35 PMPPART
Begin 24 hr. air test of the new dry system at 44 1/2 psig @2:00 PM.
BLD14-03406 FIRE-Final Inspection1/5/20151/6/20151/6/2015 9:53:58 AMAPASS
Fire life safety finaled.
FIR14-00936 INSP-Sprinkler Rough-in1/5/20151/6/20151/6/2015 9:52:26 AMAPASS
Overhead work passed both rough-in and final inspections. Permit finaled.
BLD12-02886 FIRE-Final Inspection1/5/20151/6/20151/6/2015 12:00:00 AMPCANC
Kent-Kent would like to know if you can please do at noon when you do your fire final Phone #: ###-####
FIR13-00725 INSP-Sprinkler Rough-in1/5/20151/6/20151/5/2015 9:53:49 AMPCANC
2nd floor Helix. Mike S is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
FIR13-00725 INSP-Sprinkler Rough-in/Hydro1/5/20151/6/20151/5/2015 9:50:15 AMPCANC
Inspection to be on the 3rd floor, please call 1/2 hour prior to inspection. Mike S is your contact. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus