Inspections for the day of: Tuesday, January 6, 2015.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00654 INSP-Final Inspection1/5/20151/6/20151/6/2015 3:55:27 PMPPASS
Permit finaled
FIR14-00653 INSP-Final Inspection1/5/20151/6/20151/6/2015 2:06:08 PMPCANC
Not ready for inspection due to missing tamper switch
BLD14-01765 FIRE-Final Inspection1/5/20151/6/20151/6/2015 2:05:26 PMPPASS
life safety passed
FIR14-00556 INSP-Final Inspection1/5/20151/6/20151/6/2015 2:04:50 PMPCANC
Cancelled due to issues on the water supply and frozen check valve.
FIR14-00926 INSP-Final Inspection1/5/20151/6/20151/6/2015 1:00:59 PMPCANC
Rescheduled for tomorrow due to sprinkler issues. John Phone #: ###-####
BLD14-01766 FIRE-Final Inspection1/5/20151/6/20151/6/2015 12:52:35 PMPFAIL
Project related fire alarm and fire sprinkler permits are not ready. I noted that a smoke alarm in #201 did not sound the other smoke alarms when activated.
FIR14-00899 INSP-Final Inspection1/6/20151/6/20151/6/2015 11:55:18 AMPPASS
Permit finaled. Per discussion with Jeremy, Lee and myself the latching issues with the panel have been worked out.
FIR14-00924 INSP-Sprinkler Rough-in1/5/20151/6/20151/6/2015 9:12:06 AMAPASS
Rough-in passed. Piping can be covered.
FIR14-00883 INSP-Final Inspection1/5/20151/6/20151/6/2015 9:11:42 AMAPASS
Permit finaled. Hood suppression system functioned correctly. Contractro was cleaning nozzles after I left.