FIR15-00687
| INSP-Sprinkler Rough-in | 1/5/2016 | 1/6/2016 | 1/6/2016 2:20:40 PM | P | PART |
|
|
Rough to cover inspection performed for phase 3, notated with red ink on the city approved drawings that are okay to cover.
|
NAF15-00021
| INSP-Final | 1/5/2016 | 1/6/2016 | 1/6/2016 1:23:44 PM | P | PASS |
|
|
Final inspection for hood suppression system passed/complete.
|
FIR15-00088
| INSP-Sprinkler Rough-in | 1/5/2016 | 1/6/2016 | 1/6/2016 11:06:47 AM | A | PASS |
|
|
Rough to cover/tenting insulation complete for entire project, all area's approved for cover.
|
BLD15-04023
| FIRE-Final Inspection | 1/5/2016 | 1/6/2016 | 1/6/2016 10:26:12 AM | A | FAIL |
|
|
South entry door still has thumb turn deadbolt installed on door, thumb turn deadbolt needs to be removed and changed to single action door hardware.
|
FIR15-00838
| INSP-Sprinkler Rough-in | 1/5/2016 | 1/6/2016 | 1/6/2016 10:05:19 AM | A | PART |
|
|
Underground In Building Riser/thrust block inspected, approved for cover, remainder of underground still needs installed, contractor will schedule rest of underground for later date when completed.
|
FIR15-00767
| INSP-Conference | 1/5/2016 | 1/6/2016 | 1/6/2016 10:01:23 AM | A | DONE |
|
|
Fire alarm conference complete.
|