FIR06-00062
| FIR-Aging Inspection | 1/6/2017 | 1/6/2017 | 1/9/2017 7:10:30 AM | | NR |
|
|
Contractor is out of business
|
FIR16-00305
| INSP-Sprinkler Rough-in/Hydro | 1/5/2017 | 1/6/2017 | 1/6/2017 11:47:15 AM | A | PASS |
|
|
Hydro test for the 6th floor passed.
|
BLD16-03041
| FIRE-Final Inspection | 1/5/2017 | 1/6/2017 | 1/6/2017 9:01:59 AM | A | PART |
|
|
Phase 1 life safety is complete/passed. However prior to a phase 2/final sign off the thumbturn dead bolt in the phase 1 area will need to be removed and the two remote annunciators for the duct smoke detectors will need to be repaired (shows no power) or approval from the mechanical engineer to remove the two duct detector/annunciators. Per the mechanical plans the cfm is well below the 2,000 limit.
|
BLD16-03662
| FIRE-Final Inspection | 1/5/2017 | 1/6/2017 | 1/6/2017 7:30:50 AM | A | CANC |
|
|
randy Phone #: ###-####
|
FIR16-00310
| INSP-Final Inspection | 12/30/2016 | 1/6/2017 | 1/6/2017 6:55:47 AM | A | CANC |
|
|
Troy Nelson is our foreman ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt Inspection cancelled from web by: Brad Bettencourt
|
FIR16-00337
| INSP-Final Inspection | 1/3/2017 | 1/6/2017 | 1/6/2017 6:35:52 AM | A | CANC |
|
|
As early as possible Phone #: 2089414511 >> Inspection requested via mobile web by Nathan Price Inspection cancelled via mobile web on Friday, January 06, 2017.
|
FIR16-00776
| INSP-Final Inspection | 1/5/2017 | 1/6/2017 | 1/5/2017 2:35:47 PM | A | PASS |
|
|
permit finaled
|