ELE17-00882
| ELE-Aging Inspection | 1/6/2020 | 1/6/2020 | 1/13/2020 12:11:18 PM | | DONE |
|
|
Called and left another message with contractor.
|
ELE19-04497
| Rough-In Permanent Service | 1/6/2020 | 1/6/2020 | 1/6/2020 3:02:20 PM | P | PASS |
|
|
jason Phone #: ###-#### GEC to ufer was changed to #4. p/s o/h n ok
|
ELE19-04813
| Electrical Rough-In | 1/6/2020 | 1/6/2020 | 1/6/2020 2:11:25 PM | P | PASS |
|
|
There will be someone there. If you have any questions please feel free to contact Luke ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok cover kitchen. Most walls not opened up
|
ELE19-04851
| Final | 1/6/2020 | 1/6/2020 | 1/6/2020 1:29:11 PM | P | FAIL |
|
|
Jay Phone #: ###-#### Unable to use meter main as sub panel. No way to seperate neutral feeding panel, and grounds on panel side. Also load calc will be needed to make sure house sub panel and modular panel dont pull more than 80% of buss rating.
|
ELE19-04913
| Final | 1/3/2020 | 1/6/2020 | 1/6/2020 10:11:57 AM | A | PASS |
|
|
Please contact Louis at ###-#### if any questions. Phone #: ###-#### Inspection requested via web by Louis Keller Ok final.
|
ELE19-04913
| Permanent Service | 1/6/2020 | 1/6/2020 | 1/6/2020 10:11:41 AM | P | PASS |
|
|
p/s o/h n ok
|
ELE19-00664
| Electrical Rough-In | 1/5/2020 | 1/6/2020 | 1/6/2020 10:10:27 AM | A | PASS |
|
|
Floor heat Phone #: ###-#### Inspection requested via web by Jim Williams Ok cover flr heat 2 up baths
|