Inspections for the day of: Tuesday, January 7, 1997.
Number of inspections: 30
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD96-01414 INSP - Letter of compliance1/7/19971/7/19971/7/1997 12:00:00 AM PASS
/ / 350 - c/c #11635
BLD96-01414 INSP - Letter of compliance1/7/19971/7/19971/7/1997 12:00:00 AM PASS
/ / 350 - c/c #11635
BLD96-02409 INSP - Letter of compliance1/7/19971/7/19971/7/1997 12:00:00 AM PASS
/ / 350 - c/c #11459
BLD96-02409 INSP - Letter of compliance1/7/19971/7/19971/7/1997 12:00:00 AM PASS
/ / 350 - c/c #11459
BLD96-02765 INSP - Letter of compliance1/7/19971/7/19971/7/1997 12:00:00 AM PASS
/ / 350 - c/c #12067
BLD96-02765 INSP - Letter of compliance1/7/19971/7/19971/7/1997 12:00:00 AM PASS
/ / 350 - c/c #12067
BLD96-02803 INSP - Letter of compliance1/7/19971/7/19971/7/1997 12:00:00 AM PASS
/ / 350 - c/c #11457
BLD96-02683 INSP - Letter of compliance1/7/19971/7/19971/7/1997 12:00:00 AM PASS
/ / 350 - c/c #11458
BLD96-02683 INSP - Letter of compliance1/7/19971/7/19971/7/1997 12:00:00 AM PASS
/ / 350 - c/c #11458
BLD96-02803 INSP - Letter of compliance1/7/19971/7/19971/7/1997 12:00:00 AM PASS
/ / 350 - c/c #11457
BLD96-03226 INSP - Framing/Rough-in1/6/19971/7/19971/7/1997 12:00:00 AMAPASS
01/07/97 350 - frame ok, ok to cover
BLD96-02765 INSP - Final1/6/19971/7/19971/7/1997 12:00:00 AMAPASS
01/07/97 350 - final
BLD96-02507 INSP - Framing/Rough-in1/6/19971/7/19971/7/1997 12:00:00 AMAPASS
01/07/97 350 - frame ok, ok to insulate
MEC96-03453 INSP - Final1/6/19971/7/19971/7/1997 12:00:00 AMAPASS
01/07/97 350 - this was final on 1/06/97
MEC96-03453 INSP - Final1/6/19971/7/19971/7/1997 12:00:00 AMAPASS
01/07/97 350 - this was final on 1/06/97
MEC96-03835 INSP - Final1/6/19971/7/19971/7/1997 12:00:00 AMAPART
01/07/97 350 - signed temp., still need to change r.t.u.s and install di
MEC96-03835 INSP - Final1/6/19971/7/19971/7/1997 12:00:00 AMAPART
01/07/97 350 - signed temp., still need to change r.t.u.s and install di
MEC96-04021 INSP - Framing/ Rough-in1/7/19971/7/19971/7/1997 12:00:00 AMAPASS
01/07/97 350 - r/i ok
MEC97-00006 INSP - Framing/ Rough-in1/6/19971/7/19971/7/1997 12:00:00 AMAFAIL
/ / 350 - INSTALLED 2 WATER HEATERS IN BASEMENT..OPEN no final correction on gas w/h vent, remove old draft diverter
MEC97-00024 INSP - Wood stoves1/6/19971/7/19971/7/1997 12:00:00 AMAPASS
01/07/97 350 - PELLET STOVE already done on 1/06/97
BLD96-00858 INSP - Final1/6/19971/7/19971/7/1997 12:00:00 AMAFAIL
01/07/97 350 - KEY ABOVE FRONT DOOR no final, need mech. final and corrections in crawlspace
BLD96-01414 INSP - Final1/6/19971/7/19971/7/1997 12:00:00 AMAPASS
01/07/97 350 - final
MEC96-03629 INSP - Final1/7/19971/7/19971/7/1997 12:00:00 AMPPASS
01/07/97 350 - already done on 1/06/96
MEC96-03629 INSP - Final1/7/19971/7/19971/7/1997 12:00:00 AMPPASS
01/07/97 350 - already done on 1/06/96
BLD96-02683 INSP - Final1/6/19971/7/19971/7/1997 12:00:00 AMPPASS
01/07/97 350 - final
BLD96-02409 INSP - Final1/6/19971/7/19971/7/1997 12:00:00 AMPPASS
01/07/97 350 - final
BLD96-02103 INSP - Energy code compliance1/7/19971/7/19971/7/1997 12:00:00 AMPPASS
01/07/97 350 - CALLED IN LAST FRIDAY - NOT DONE AS PER CALLER... insulation ok, ok to cover
MEC96-03431 INSP - Final1/7/19971/7/19971/7/1997 12:00:00 AMPFAIL
01/07/97 350 - no final, corrections: need prot. post and outside a/c un
MEC96-03431 INSP - Final1/7/19971/7/19971/7/1997 12:00:00 AMPFAIL
01/07/97 350 - no final, corrections: need prot. post and outside a/c un
BLD96-02803 INSP - Final1/7/19971/7/19971/7/1997 12:00:00 AMPPASS
01/07/97 350 - final