ELE98-04513
| INSP - Final | 1/6/1999 | 1/7/1999 | 1/7/1999 12:00:00 AM | A | PASS |
|
|
01/06/99 403 - emmet- ###-#### re-insp temp pole ..trans jms.. OK
|
ELE98-04551
| INSP - Electrical Rough-In | 1/6/1999 | 1/7/1999 | 1/7/1999 12:00:00 AM | A | PASS |
|
|
01/06/99 403 - PAUL ###-#### BUILDING OUT-BACK; ELE R/I. CORRECTONS COMPLETED.
|
ELE99-00045
| INSP - Electrical Rough-In | 1/5/1999 | 1/7/1999 | 1/7/1999 12:00:00 AM | A | PASS |
|
|
01/06/99 403 - STEVE ###-#### ELE R/I PERM/SVC. OK
|
ELE99-00046
| INSP - Electrical Rough-In | 1/5/1999 | 1/7/1999 | 1/7/1999 12:00:00 AM | A | PASS |
|
|
01/06/99 403 - CHUCK ###-#### TEMP POLE ONLY OK
|
ELE99-00060
| INSP - Electrical Rough-In | 1/6/1999 | 1/7/1999 | 1/7/1999 12:00:00 AM | A | PASS |
|
|
01/06/99 403 - George ###-#### RE-CONNECTION OF BRANCH CIRCUITS IN GARAGE. OK
|
ELE99-00061
| INSP - Electrical Rough-In | 1/7/1999 | 1/7/1999 | 1/7/1999 12:00:00 AM | P | PASS |
|
|
01/07/99 403 - ELE R/I; PERM/SVC -OK CEILING FRAMING
|
ELE99-00064
| INSP - Final | 1/7/1999 | 1/7/1999 | 1/7/1999 12:00:00 AM | P | FAIL |
|
|
01/07/99 403 - lenny ###-#### fn insp NO.# 4 CU.FOR CONCRETE ENCASED GROUNDING CONDUCTOR FOR SERVICE, (NO UFER).
|
ELE99-00066
| INSP - Final | 1/7/1999 | 1/7/1999 | 1/7/1999 12:00:00 AM | P | PASS |
|
|
01/07/99 403 - DENNIS ###-#### SUB-PANEL. OK
|
ELE98-02733
| INSP - Final | 1/7/1999 | 1/7/1999 | 1/7/1999 12:00:00 AM | P | NH |
|
|
01/07/99 403 - Nancy ###-#### LEFT CARED; CONTACTED CONTRACTOR, WILL RESCHEDULE.
|
ELE98-04382
| INSP - Final | 1/7/1999 | 1/7/1999 | 1/7/1999 12:00:00 AM | P | PASS |
|
|
01/07/99 403 - after 3:30 Steve ###-#### GARAGE. OK
|