Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-03690 BLD-Footing1/6/20001/7/20001/7/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/06/2000 at 16:22:44. Contact: ###-####. Setback appears ok.
BLD99-03695 BLD-Footing1/6/20001/7/20001/7/2000 12:00:00 AMAPART
###-#### Scott. Sign "footing" excav. ok.
BLD99-03377 BLD-Final1/6/20001/7/20001/7/2000 12:00:00 AMAPASS
Struct. ok for C/O.. if CDHD permanent.
BLD99-03145 BLD-Footing1/6/20001/7/20001/7/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/06/2000 at 15:36:54. Contact: ###-####. Spec. insp onsite.
BLD99-02985 BLD-Framing/Rough-in1/6/20001/7/20001/7/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/06/2000 at 11:57:05. Contact: . C/N block floor joists as req'd. ok.
BLD99-03301 BLD-Final1/7/20001/7/20001/7/2000 12:00:00 AMPFAIL
###-#### gary. Need smoke det's.. Recall.
MEC00-00062 Final1/7/20001/7/20001/7/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/07/2000 at 09:04:32. Contact: ###-####.
BLD99-00682 BLD-Conference1/7/20001/7/20001/7/2000 12:00:00 AMPPASS
w/Mike Otto & project mngr. keep C/N re: dampers @ corridor.
BLD99-00444 BLD-Conference1/7/20001/7/20001/7/2000 12:00:00 AMPPASS
Met w/builder onsite, need soils test report. Pour at own risk.
BLD99-03145 BLD-Foundation1/6/20001/7/20001/6/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/06/2000 at 15:38:08. Contact: ###-####. Spec. insp.