BLD01-02450
| BLD-Aging Inspection | 1/7/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | | PART |
|
|
WIP 1/7/2002 4:13:00 PM
|
BLD01-01500
| BLD-Aging Inspection | 1/7/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | | PART |
|
|
Electr Needs final....Talked to John ###-####.....Will follow up on (home owner) Electr permit to final. 1/14/2002 9:43:26 AM
|
BLD01-02343
| BLD-Final | 1/4/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/04/2002 at 15:19:49. Contact: ###-####. C/C issued. 1/8/2002 2:14:37 PM
|
BLD01-03175
| BLD-Other | 1/4/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | A | FAIL |
|
|
GARY ###-#### ( RACKING ) Need all Required signatures on Occ Request card. 1/7/2002 3:42:13 PM
|
BLD01-03248
| BLD-Footing | 1/7/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | P | PART |
|
|
###-####
|
BLD01-03247
| BLD-Conference | 1/7/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | P | PART |
|
|
###-#### Footing insp. 1/7/2002 3:28:23 PM
|
BLD01-03001
| BLD-Framing/Rough-in | 1/7/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | P | FAIL |
|
|
###-#### WALL COVER NR.....Finish firestopping at Corridors. 1/7/2002 4:05:04 PM
|
MEC01-03888
| Rough-in | 1/7/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/07/2002 at 09:59:45. Contact: ###-####.
|
MEC01-03888
| Pressure Test | 1/7/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 01/07/2002 at 10:00:01. Contact: ###-####. NR 1/7/2002 3:23:22 PM
|
BLD01-03175
| BLD-Final | 1/7/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | P | FAIL |
|
|
###-#### Need Fire inspectors signature......C/N pending. 1/7/2002 3:43:17 PM
|