MEC01-02828
| MEC-Aging Inspection | 1/7/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | | PASS |
|
|
work in progress 1/7/2002 7:35:11 AM
|
MEC01-02601
| MEC-Aging Inspection | 1/7/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | | PASS |
|
|
finaled by 316 1/7/2002 7:35:42 AM
|
MEC01-03000
| MEC-Aging Inspection | 1/7/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | | PASS |
|
|
called contractor and told them this hadn't been called in for an inspection 1/7/2002 8:14:04 AM
|
MEC01-03734
| Rough-in | 1/4/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/04/2002 at 16:07:50. Contact: ###-####.
|
MEC02-00019
| Pressure Test | 1/4/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | A | PART |
|
|
323 -1267 ok to cover 9 lines into bldg..will need to retest 6 after equipment located 1/7/2002 9:34:28 AM
|
MEC01-03877
| Final | 12/31/2001 | 1/7/2002 | 1/7/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/31/2001 at 12:18:21. Contact: ###-####.... 1/7/2002 12:22:05 PM goddard..r on christine 1/7/2002 12:22:13 PM no 90' offsets allowed in b-vent 1/7/2002 6:33:04 PM
|
MEC02-00044
| Final | 1/7/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/07/2002 at 08:09:52. Contact: ###-####.
|
MEC02-00048
| Final | 1/7/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | P | NR |
|
|
###-####...maple grove..left on mcmillan..left on linda vista 1/7/2002 12:17:44 PM
|
MEC02-00051
| Rough-in | 1/7/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | P | PASS |
|
|
###-#### ..off vista..r on nez perce 1/7/2002 12:20:50 PM
|
MEC02-00051
| Pressure Test | 1/7/2002 | 1/7/2002 | 1/7/2002 12:00:00 AM | P | PASS |
|
|
|