BLD02-01324
| BLD-Aging Inspection | 1/7/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | | DONE |
|
|
elec not finalled...expire 1/7/2003 9:46:15 AM
|
BLD02-01533
| BLD-Aging Inspection | 1/7/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | | PASS |
|
|
Wip... 1/7/2003 9:44:19 AM
|
MIS02-00112
| MIS-Aging Inspection | 1/7/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | | PASS |
|
|
no further action by complaintant 1/7/2003 9:24:46 AM
|
MIS02-00163
| MIS-Aging Inspection | 1/7/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | | DONE |
|
|
Halfway house...project reviewed by 325, this permit superceded. 1/7/2003 10:16:23 AM
|
BLD02-00902
| BLD-Final | 1/6/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/06/2003 at 14:53:34. Contact: ###-####....elec finalled, ok 1/7/2003 9:17:38 AM
|
BLD02-02336
| BLD-Final | 1/6/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | A | NR |
|
|
###-####
|
BLD01-02887
| BLD-Final | 1/6/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | A | NR |
|
|
Dan ###-####
|
BLD02-00199
| BLD-Conference | 1/6/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | A | PASS |
|
|
###-#### ... WIP, resubmittals req'd if project is halved. 1/7/2003 11:47:36 AM
|
BLD02-02967
| BLD-Conference | 1/7/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | A | PASS |
|
|
need to patch-fill fnd wall blockouts thru to exterior, add retro-fit hd's at brace panels...infill garage hse wall opening ( solid 2 wythe brick, may delete 5/8" gypsum at wall only...)
|
BLD02-00365
| BLD-Conference | 1/7/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | A | PASS |
|
|
rec'd MTI report approving foam, still need finals for occupancy. Posted c/n onsite.
|
BLD96-02171
| BLD-Final | 1/6/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | A | PASS |
|
|
###-####, guardrails, exit doors ok; verify other signatures at office (P&Z...heating as NA) 1/7/2003 11:20:27 AM
|
BLD02-02641
| BLD-Framing/Rough-in | 1/7/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | P | PASS |
|
|
c/n ok
|
BLD02-01113
| BLD-Conference | 1/7/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | P | PASS |
|
|
Keep c/n, need to remove thumb-turn latch, install lever set or panic type hdwe as req'd for add'l exit door added...see 1003.3.1.8, etc.
|
BLD02-02336
| BLD-Framing/Rough-in | 1/7/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | P | PASS |
|
|
|
BLD01-02887
| BLD-Framing/Rough-in | 1/7/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | P | PART |
|
|
existing bldg, observed gypsum installation prior to covering w/ finish mat'ls, seal-firestop rated assy's.
|
BLD02-02336
| BLD-Final | 1/7/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | P | PASS |
|
|
8668427, ok for l/c. 1/7/2003 4:31:54 PM
|
BLD01-02887
| BLD-Final | 1/7/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | P | FAIL |
|
|
Dan ###-####, c/n: add smoke/heat vent at roof as spec'd; ok for t/o. 1/7/2003 5:03:16 PM
|
BLD02-02735
| BLD-Footing | 1/6/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | P | PART |
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...garage, ext stair, isolated ftg's ok...drains & waterproofing installed at front. 1/7/2003 2:32:51 PM
|
BLD02-02967
| BLD-Other | 1/6/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/06/2003 at 15:22:51. Contact: ###-####....ext nailing ok, need to add hold downs in pairs as shown. 1/7/2003 1:09:20 PM
|
BLD02-01113
| BLD-Framing/Rough-in | 1/7/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | P | PART |
|
|
larry -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie, new store front ok, keep c/n re exit hdwe. 1/7/2003 4:33:35 PM
|
BLD02-02641
| BLD-Energy code compliance | 1/7/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | P | PASS |
|
|
trenton; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD02-01202
| BLD-Final | 1/7/2003 | 1/7/2003 | 1/7/2003 12:00:00 AM | P | NR |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung. need report (faxed) for final 1/7/2003 5:28:17 PM
|