Inspections for the day of: Tuesday, January 7, 2003.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01324 BLD-Aging Inspection1/7/20031/7/20031/7/2003 12:00:00 AM DONE
elec not finalled...expire 1/7/2003 9:46:15 AM
BLD02-01533 BLD-Aging Inspection1/7/20031/7/20031/7/2003 12:00:00 AM PASS
Wip... 1/7/2003 9:44:19 AM
MIS02-00112 MIS-Aging Inspection1/7/20031/7/20031/7/2003 12:00:00 AM PASS
no further action by complaintant 1/7/2003 9:24:46 AM
MIS02-00163 MIS-Aging Inspection1/7/20031/7/20031/7/2003 12:00:00 AM DONE
Halfway house...project reviewed by 325, this permit superceded. 1/7/2003 10:16:23 AM
BLD02-00902 BLD-Final1/6/20031/7/20031/7/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/06/2003 at 14:53:34. Contact: ###-####....elec finalled, ok 1/7/2003 9:17:38 AM
BLD02-02336 BLD-Final1/6/20031/7/20031/7/2003 12:00:00 AMANR
###-####
BLD01-02887 BLD-Final1/6/20031/7/20031/7/2003 12:00:00 AMANR
Dan ###-####
BLD02-00199 BLD-Conference1/6/20031/7/20031/7/2003 12:00:00 AMAPASS
###-#### ... WIP, resubmittals req'd if project is halved. 1/7/2003 11:47:36 AM
BLD02-02967 BLD-Conference1/7/20031/7/20031/7/2003 12:00:00 AMAPASS
need to patch-fill fnd wall blockouts thru to exterior, add retro-fit hd's at brace panels...infill garage hse wall opening ( solid 2 wythe brick, may delete 5/8" gypsum at wall only...)
BLD02-00365 BLD-Conference1/7/20031/7/20031/7/2003 12:00:00 AMAPASS
rec'd MTI report approving foam, still need finals for occupancy. Posted c/n onsite.
BLD96-02171 BLD-Final1/6/20031/7/20031/7/2003 12:00:00 AMAPASS
###-####, guardrails, exit doors ok; verify other signatures at office (P&Z...heating as NA) 1/7/2003 11:20:27 AM
BLD02-02641 BLD-Framing/Rough-in1/7/20031/7/20031/7/2003 12:00:00 AMPPASS
c/n ok
BLD02-01113 BLD-Conference1/7/20031/7/20031/7/2003 12:00:00 AMPPASS
Keep c/n, need to remove thumb-turn latch, install lever set or panic type hdwe as req'd for add'l exit door added...see 1003.3.1.8, etc.
BLD02-02336 BLD-Framing/Rough-in1/7/20031/7/20031/7/2003 12:00:00 AMPPASS
BLD01-02887 BLD-Framing/Rough-in1/7/20031/7/20031/7/2003 12:00:00 AMPPART
existing bldg, observed gypsum installation prior to covering w/ finish mat'ls, seal-firestop rated assy's.
BLD02-02336 BLD-Final1/7/20031/7/20031/7/2003 12:00:00 AMPPASS
8668427, ok for l/c. 1/7/2003 4:31:54 PM
BLD01-02887 BLD-Final1/7/20031/7/20031/7/2003 12:00:00 AMPFAIL
Dan ###-####, c/n: add smoke/heat vent at roof as spec'd; ok for t/o. 1/7/2003 5:03:16 PM
BLD02-02735 BLD-Footing1/6/20031/7/20031/7/2003 12:00:00 AMPPART
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...garage, ext stair, isolated ftg's ok...drains & waterproofing installed at front. 1/7/2003 2:32:51 PM
BLD02-02967 BLD-Other1/6/20031/7/20031/7/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/06/2003 at 15:22:51. Contact: ###-####....ext nailing ok, need to add hold downs in pairs as shown. 1/7/2003 1:09:20 PM
BLD02-01113 BLD-Framing/Rough-in1/7/20031/7/20031/7/2003 12:00:00 AMPPART
larry -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie, new store front ok, keep c/n re exit hdwe. 1/7/2003 4:33:35 PM
BLD02-02641 BLD-Energy code compliance1/7/20031/7/20031/7/2003 12:00:00 AMPPASS
trenton; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD02-01202 BLD-Final1/7/20031/7/20031/7/2003 12:00:00 AMPNR
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung. need report (faxed) for final 1/7/2003 5:28:17 PM