MEC03-00114
| Final | 1/6/2004 | 1/7/2004 | 1/7/2004 12:00:00 AM | A | CANC |
|
|
ran out of time, had staff meeting will do first thing pm 1/7/2004 4:21:07 PM
|
MEC04-00020
| Final | 1/6/2004 | 1/7/2004 | 1/7/2004 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 1/6/2004 at 11:13:03 AM. Contact: ###-####.
|
MEC04-00018
| Rough-in | 1/6/2004 | 1/7/2004 | 1/7/2004 12:00:00 AM | A | FAIL |
|
|
insulate duct r-5 as per iecc and approved plans, also find out about one hour wall if this is required 1/7/2004 3:00:18 PM
|
MEC03-03704
| Rough-in | 1/6/2004 | 1/7/2004 | 1/7/2004 12:00:00 AM | A | NR |
|
|
angie; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
MEC04-00025
| Rough-in | 1/6/2004 | 1/7/2004 | 1/7/2004 12:00:00 AM | P | PART |
|
|
left c/n with installer about corrections in water heater room 1/7/2004 4:20:32 PM
|
MEC04-00023
| Final | 1/6/2004 | 1/7/2004 | 1/7/2004 12:00:00 AM | P | NH |
|
|
PLEASE INSPECT AS CLOSE TO 3:00PM AS POSSIBLE
THANKS
C; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
|
MEC03-03468
| Final | 1/7/2004 | 1/7/2004 | 1/7/2004 12:00:00 AM | P | NR |
|
|
did this next morning, ok for ceiling tile 1/8/2004 10:50:16 AM
|
MEC04-00030
| Rough-in | 1/7/2004 | 1/7/2004 | 1/7/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/7/2004 at 10:00:43 AM. Contact: ###-####.
|
MEC04-00018
| Rough-in | 1/7/2004 | 1/7/2004 | 1/7/2004 12:00:00 AM | P | FAIL |
|
|
|