Inspections for the day of: Friday, January 7, 2005.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00608 INSP-Sprinkler Rough-in1/6/20051/7/20051/7/2005 12:00:00 AMAPART
Forward flush for the new backflow preventors and the final hydro test passed. Corrections have been made to all items previously listed except for items in DBSI's tenant space. Need test papers from contractor. 1/7/2005 11:41:38 AM
FIR04-00801 INSP-Final Inspection1/6/20051/7/20051/7/2005 12:00:00 AMAPASS
Fire alarm finaled 1/7/2005 11:08:33 AM
FIR04-00777 INSP-Sprinkler Rough-in/Hydro1/7/20051/7/20051/7/2005 12:00:00 AMAPASS
Sprinkler piping is ok to cover. Waiting for ceiling tile. 1/7/2005 1:16:39 PM
FIR04-00640 INSP-Sprinkler Rough-in/Hydro1/7/20051/7/20051/7/2005 12:00:00 AMAPASS
Mezzanine demo'ed 1/7/2005 1:17:36 PM
FIR04-00640 INSP-Sprinkler Rough-in/Hydro1/7/20051/7/20051/7/2005 12:00:00 AMAPASS
Mezzanine demo'ed 1/7/2005 1:17:36 PM
FIR04-00651 INSP-Sprinkler Rough-in/Hydro1/7/20051/7/20051/7/2005 12:00:00 AMAPASS
Antifreeze loop converted to wet system 1/7/2005 1:15:36 PM
FIR04-00804 INSP-Final Inspection1/7/20051/7/20051/7/2005 12:00:00 AMPPASS
Hood suppression system operated correctly 1/7/2005 11:09:26 AM
FIR03-00012 INSP-Final Inspection1/7/20051/7/20051/7/2005 12:00:00 AMPFAIL
Bells still did not ring within 90 seconds 1/7/2005 2:29:29 PM
FIR04-00627 INSP-Sprinkler Rough-in/Hydro1/7/20051/7/20051/7/2005 12:00:00 AMPPART
Remaining underground supply piping from the stake to the previously approved stub out is ok to cover 1/7/2005 3:08:40 PM
FIR04-00768 INSP-Conference1/7/20051/7/20051/7/2005 12:00:00 AMPDONE
I was at the job site doing a fire sprinkler rough-in on the 3rd and 4th floors and found fire alarm device backboxes and wire installed throughout the 3rd floor and in small areas of the 4th floor. After verifing that only the 2nd floor had be approved for starting with Mary and Dave I issued a stop work order to the project superintendant. Stop work order is for all fire alarm work and sheet rock work that would cover up the fire alarm work. I made this clear with the superintendant.
FIR04-00758 INSP-Final Inspection1/7/20051/7/20051/7/2005 12:00:00 AMPPASS
Fire sprinklers finaled
FIR04-00656 INSP-Sprinkler Rough-in1/6/20051/7/20051/7/2005 12:00:00 AMPPART
Third floor piping is ok to cover except areas marked on approved plans. 1/7/2005 2:28:49 PM
BLD04-02515 FIRE-Final Inspection1/6/20051/7/20051/7/2005 12:00:00 AMPPASS
Fire life safety finaled 1/7/2005 3:39:23 PM