FIR04-00608
| INSP-Sprinkler Rough-in | 1/6/2005 | 1/7/2005 | 1/7/2005 12:00:00 AM | A | PART |
|
|
Forward flush for the new backflow preventors and the final hydro test passed. Corrections have been made to all items previously listed except for items in DBSI's tenant space. Need test papers from contractor. 1/7/2005 11:41:38 AM
|
FIR04-00801
| INSP-Final Inspection | 1/6/2005 | 1/7/2005 | 1/7/2005 12:00:00 AM | A | PASS |
|
|
Fire alarm finaled 1/7/2005 11:08:33 AM
|
FIR04-00777
| INSP-Sprinkler Rough-in/Hydro | 1/7/2005 | 1/7/2005 | 1/7/2005 12:00:00 AM | A | PASS |
|
|
Sprinkler piping is ok to cover. Waiting for ceiling tile. 1/7/2005 1:16:39 PM
|
FIR04-00640
| INSP-Sprinkler Rough-in/Hydro | 1/7/2005 | 1/7/2005 | 1/7/2005 12:00:00 AM | A | PASS |
|
|
Mezzanine demo'ed 1/7/2005 1:17:36 PM
|
FIR04-00640
| INSP-Sprinkler Rough-in/Hydro | 1/7/2005 | 1/7/2005 | 1/7/2005 12:00:00 AM | A | PASS |
|
|
Mezzanine demo'ed 1/7/2005 1:17:36 PM
|
FIR04-00651
| INSP-Sprinkler Rough-in/Hydro | 1/7/2005 | 1/7/2005 | 1/7/2005 12:00:00 AM | A | PASS |
|
|
Antifreeze loop converted to wet system 1/7/2005 1:15:36 PM
|
FIR04-00804
| INSP-Final Inspection | 1/7/2005 | 1/7/2005 | 1/7/2005 12:00:00 AM | P | PASS |
|
|
Hood suppression system operated correctly 1/7/2005 11:09:26 AM
|
FIR03-00012
| INSP-Final Inspection | 1/7/2005 | 1/7/2005 | 1/7/2005 12:00:00 AM | P | FAIL |
|
|
Bells still did not ring within 90 seconds 1/7/2005 2:29:29 PM
|
FIR04-00627
| INSP-Sprinkler Rough-in/Hydro | 1/7/2005 | 1/7/2005 | 1/7/2005 12:00:00 AM | P | PART |
|
|
Remaining underground supply piping from the stake to the previously approved stub out is ok to cover 1/7/2005 3:08:40 PM
|
FIR04-00768
| INSP-Conference | 1/7/2005 | 1/7/2005 | 1/7/2005 12:00:00 AM | P | DONE |
|
|
I was at the job site doing a fire sprinkler rough-in on the 3rd and 4th floors and found fire alarm device backboxes and wire installed throughout the 3rd floor and in small areas of the 4th floor. After verifing that only the 2nd floor had be approved for starting with Mary and Dave I issued a stop work order to the project superintendant. Stop work order is for all fire alarm work and sheet rock work that would cover up the fire alarm work. I made this clear with the superintendant.
|
FIR04-00758
| INSP-Final Inspection | 1/7/2005 | 1/7/2005 | 1/7/2005 12:00:00 AM | P | PASS |
|
|
Fire sprinklers finaled
|
FIR04-00656
| INSP-Sprinkler Rough-in | 1/6/2005 | 1/7/2005 | 1/7/2005 12:00:00 AM | P | PART |
|
|
Third floor piping is ok to cover except areas marked on approved plans. 1/7/2005 2:28:49 PM
|
BLD04-02515
| FIRE-Final Inspection | 1/6/2005 | 1/7/2005 | 1/7/2005 12:00:00 AM | P | PASS |
|
|
Fire life safety finaled 1/7/2005 3:39:23 PM
|