Inspections for the day of: Wednesday, January 7, 2009.
Number of inspections: 26
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00899 Aging Inspection1/7/20091/7/20091/8/2009 4:03:12 PM DONE
ESC08-00700 Random Inspection1/7/20091/7/20091/7/2009 3:58:59 PMPPASS
ESC06-00897 Site Final1/7/20091/7/20091/7/2009 3:33:24 PMPPASS
ESC08-00769 Random Inspection12/31/20081/7/20091/7/2009 2:29:52 PMAPASS
ESC08-00130 Site Final1/7/20091/7/20091/7/2009 2:20:21 PMPPASS
ESC06-01909 Site Final1/7/20091/7/20091/7/2009 2:01:10 PMPPASS
ESC06-01908 Site Final1/7/20091/7/20091/7/2009 2:00:53 PMPPASS
ESC06-01907 Site Final1/7/20091/7/20091/7/2009 2:00:30 PMPPASS
ESC06-01588 Site Final1/7/20091/7/20091/7/2009 1:31:32 PMPPASS
ESC07-00934 Site Final1/7/20091/7/20091/7/2009 1:31:23 PMPPASS
ESC07-00935 Site Final1/7/20091/7/20091/7/2009 1:31:15 PMPPASS
ESC07-00929 Site Final1/7/20091/7/20091/7/2009 1:31:05 PMPPASS
ESC07-00933 Site Final1/7/20091/7/20091/7/2009 1:30:51 PMPPASS
ESC07-00931 Site Final1/7/20091/7/20091/7/2009 1:30:43 PMPPASS
ESC07-00930 Site Final1/7/20091/7/20091/7/2009 1:30:31 PMPPASS
ESC07-00987 Random Inspection1/7/20091/7/20091/7/2009 1:29:22 PMPPASS
ESC08-00539 Random Inspection1/7/20091/7/20091/7/2009 1:28:51 PMPPASS
ESC06-00902 Aging Inspection1/7/20091/7/20091/7/2009 1:18:34 PM DONE
ESC06-00902 Site Final1/7/20091/7/20091/7/2009 1:18:16 PMPPASS
ESC08-00924 BMP Violation1/7/20091/7/20091/7/2009 12:22:16 PMACANC
ESC08-00491 Tracking Control1/7/20091/7/20091/7/2009 9:47:53 AMAPASS
ESC08-00737 Tracking Control1/7/20091/7/20091/7/2009 9:47:06 AMAFAIL
Need to clean up all sediment from from the off haul of the stock pile. Left a message withthe RP of the project. Will re-inspect on 1/8/09
ESC08-00788 Random Inspection1/7/20091/7/20091/7/2009 8:38:48 AMAPASS
ESC06-01413 Site Final1/7/20091/7/20091/7/2009 8:36:18 AMPPASS
ESC08-00002 Site Final1/7/20091/7/20091/7/2009 8:35:36 AMPPASS
ESC08-00923 Site Preparation1/7/20091/7/20091/7/2009 8:29:31 AM PART
Left a message with the RP.
Post ESC sign at the front gate of the lumber yard off of Production Ave.
Provide a concrete wash out pit area for any further pours.
All in all, site looks good. All materail kept organized. Trash container provided. No stabilized entrance required.