FIR09-00593
| FIR-Aging Inspection | 1/7/2010 | 1/7/2010 | 1/8/2010 4:28:27 PM | | DONE |
|
|
Need site inspection request for permit final.
|
FIR09-00540
| INSP-Sprinkler Rough-in/Hydro | 1/7/2010 | 1/7/2010 | 1/7/2010 5:35:05 PM | P | NR |
|
|
Overhead not ready for hydrostatic test.
|
BLD09-00515
| FIRE-Final Inspection | 1/7/2010 | 1/7/2010 | 1/7/2010 5:34:01 PM | P | PART |
|
|
Office okayed per activity notes.
|
FIR09-00684
| INSP-Final Inspection | 1/7/2010 | 1/7/2010 | 1/7/2010 5:32:44 PM | A | NH |
|
|
No access to complete inspection, appears construction is still underway.
|
FIR09-00536
| INSP-Sprinkler Rough-in | 1/5/2010 | 1/7/2010 | 1/7/2010 5:31:41 PM | A | FAIL |
|
|
Upright heads at three closets on the first floor are too far below the deck, two mech. shafts and one custodial closet are not yet piped. Remainder of sheetrock lids at the first and second floors are okay for cover- see annotations on plans with today's date for locations.
|
BLD09-01689
| FIRE-Final Inspection | 1/7/2010 | 1/7/2010 | 1/7/2010 5:27:22 PM | A | PASS |
|
|
Correction items verified for completion, notified tenant to obtain CO at city hall.
|
FIR09-00694
| INSP-Final Inspection | 1/7/2010 | 1/7/2010 | 1/7/2010 5:25:02 PM | A | PASS |
|
|
Plans verified on site, fire sprinkler work completed satisfactory, inspection passed, permit finaled.
|