ESC09-00736
| Site Preparation | 1/7/2010 | 1/7/2010 | 1/7/2010 11:18:28 AM | | FAIL |
|
|
Verbal to RP: Clean up all track off of all hard surfaces. Will re-inspect 1/08/10pm.
|
ESC09-00793
| General Inspection | 1/7/2010 | 1/7/2010 | 1/7/2010 10:57:56 AM | P | DONE |
|
|
Explained to the concrete contractor and the concrete company (idaho concrete) that the clean of the shoots need to be completed into the concrete washout pit that has been provided
|
ESC09-00793
| Tracking Control | 1/7/2010 | 1/7/2010 | 1/7/2010 10:56:13 AM | P | PASS |
|
|
|
ESC09-00791
| BMP Violation | 1/7/2010 | 1/7/2010 | 1/7/2010 10:44:43 AM | A | FAIL |
|
|
Verbal to RP: Place all concrete washout residual into the washout pit that has been constructed. Explain to the contractor of what is required when doing concrete cleaning out. Will re-inspect on 1/11/10
|
ESC09-00791
| Complaint Inspection | 1/7/2010 | 1/7/2010 | 1/7/2010 10:42:53 AM | P | PASS |
|
|
Found that the equiptment that was staged in the parking lot to the east was Boise City Public works. It will be removed today. It was done to to the conditions of the staging area yesterday. Spoke to RP and told him that if the area was going to be utilized as a staging area in the future, that the ESC permit would need to be ammended to show the area. Also they would need to get an approval from the landowner for the use of the parking lot. Will contact the complaintee of the resolution.
|
ESC09-00507
| General Inspection | 1/6/2010 | 1/7/2010 | 1/7/2010 9:53:23 AM | A | DONE |
|
|
Starting to construct the stabilized drainage channel and sediment traps today. Will folluw up with the completion of the work.
|
ESC09-00201
| Tracking Control | 1/7/2010 | 1/7/2010 | 1/7/2010 9:48:58 AM | A | FAIL |
|
|
Verbal to RP: Clean up all track off of all three exits off of the project area. Will re-inspect on 1/8/10am.
|
ESC39-00007
| Site Preparation | 1/7/2010 | 1/7/2010 | 1/7/2010 8:34:41 AM | | CANC |
|
|
Training ESC module.
|
ESC09-00769
| Site Preparation | 1/6/2010 | 1/7/2010 | 1/7/2010 8:34:12 AM | P | CANC |
|
|
|
ESC09-00770
| Tracking Control | 1/5/2010 | 1/7/2010 | 1/7/2010 8:34:05 AM | A | FAIL |
|
|
Message to RP; Correction Notice: 1.Clean up all sediment anddebris off of all hardsurfaces. 2. Install a proper construction exit per industry standards. Failure to comply with the notice will result in a stop work order.
|
ESC09-00769
| Tracking Control | 1/5/2010 | 1/7/2010 | 1/7/2010 8:33:21 AM | A | FAIL |
|
|
Message to RP; Correction Notice: 1.Clean up all sediment anddebris off of all hardsurfaces. 2. Install a proper construction exit per industry standards. Failure to comply with the notice will result in a stop work order. Will re-inspect on 1/8/10am.
|