FIR09-00107
| INSP-Final Inspection | 1/7/2011 | 1/7/2011 | 1/7/2011 3:16:21 PM | P | CANC |
|
|
CARISSA had not corrdinated with Alarmco to perform this inspection. Will need to be rescheduled.
|
BLD10-02170
| FIRE-Conference | 1/7/2011 | 1/7/2011 | 1/7/2011 2:42:44 PM | P | DONE |
|
|
I went over life safety requirements prior to the final inspection. This included verifying that the existing exit discharge lights still function, verifying the new exit signs/emergency lights work, tagging the fire exitinguishers and providing the correct occupant load sign for the coffee shop.
|
BLD10-01509
| FIRE-Final Inspection | 1/7/2011 | 1/7/2011 | 1/7/2011 1:42:55 PM | P | CANC |
|
|
Life safety inspection was not performed due to the project related fire alarm permit not being finished yet.
|
FIR03-00510
| INSP-Final Inspection | 1/6/2011 | 1/7/2011 | 1/7/2011 1:08:26 PM | A | CANC |
|
|
Cancelled due to no access to the fire alarm control panel.
|
FIR10-00548
| INSP-Final Inspection | 1/6/2011 | 1/7/2011 | 1/7/2011 1:07:27 PM | A | FAIL |
|
|
Inspection was cancelled due to tenant complaints per Jeff's direction. I went ahead and verified locations of the audio/visuals. Everything was located ok except one 115cd ceiling mount will need to be increased to 135cd to provide adequate coverage to the "welding curtain" walls. These walls were not shown on the city approved plans. I also noted that the two new duct smoke detectors were not located per code. I discussed possible solutions with the on site fire alarm tech and the tenants designer. No actual testing of devices including the end of line voltage drops were done.
|
FIR10-00579
| INSP-Sprinkler Rough-in | 1/6/2011 | 1/7/2011 | 1/7/2011 1:00:36 PM | A | PASS |
|
|
See the city approved plans for the location where the sprinkler piping can be covered. It is marked with todays date.
|