FIR12-00666
| INSP-Final Inspection | 1/7/2013 | 1/7/2013 | 1/7/2013 3:11:50 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00163
| INSP-Final Inspection | 1/4/2013 | 1/7/2013 | 1/7/2013 2:51:29 PM | A | PASS |
|
|
Permit finaled
|
FIR12-00663
| INSP-Sprinkler Rough-in/Hydro | 1/7/2013 | 1/7/2013 | 1/7/2013 2:23:18 PM | P | PASS |
|
|
The overhead hydro for 1st floor and rough to cover for 2nd floor passed. Sprinkler piping can be covered.
|
BLD12-01910
| FIRE-Conference | 1/7/2013 | 1/7/2013 | 1/7/2013 2:18:41 PM | P | PASS |
|
|
Sprinkler piping is ok to cover.
|
FIR12-00748
| INSP-Sprinkler Rough-in | 1/7/2013 | 1/7/2013 | 1/7/2013 2:01:25 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered.
|
FIR12-00757
| INSP-Final Inspection | 1/7/2013 | 1/7/2013 | 1/7/2013 1:33:03 PM | P | PASS |
|
|
Permit finaled.
|
BLD12-02671
| FIRE-Final Inspection | 1/4/2013 | 1/7/2013 | 1/7/2013 1:31:59 PM | P | PASS |
|
|
Life safety passed
|
BLD12-03322
| FIRE-Conference | 1/7/2013 | 1/7/2013 | 1/7/2013 1:28:47 PM | P | PASS |
|
|
life safety passed
|