Inspections for the day of: Wednesday, January 7, 2015.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00182 INSP-Alarm Testing1/5/20151/7/20151/8/2015 4:07:42 PMPFAIL
Plan modification will be necessary due to numerous changes to the original design and approved plans including; approx 25 new ID detectors, mag locks at three sets of doors, added smoke and heat detection at the elevator hoistway, relocated sprinkler risers, new ADA rooms and notification appliances, revised matrix, etc. Need to provide notification at the gym restroom, post signage at the FACP room door. Elevator is not in service to complete recall and shunt tests.
BLD14-03496 FIRE-Final Inspection1/7/20151/7/20151/7/2015 3:44:56 PMPFAIL
C/N items include; repair two existing exit signs, provide two new exit signs at locations discussed, provide plans reflecting revised room usage at rm 344. Missing doors and hardware at some locations.
FIR14-00911 INSP-Final Inspection1/7/20151/7/20151/7/2015 3:42:43 PMPPASS
Scope of work completed and passed functional testing. Per general contractor room 344 is no longer a "mothers room" and is now a "storage room"- ref. revised building plans for changes. Fire alarm permit finaled.
BLD14-01868 FIRE-Final Inspection1/6/20151/7/20151/7/2015 2:40:14 PMAFAIL
Items noted include; trouble condition at the FACP remote annunciator, missing fire sprinkler coverage at the new beer cooler, overspaced sprinkler coverage adjacent to the new cooler, remove keyed lock deadbolt at the basement kitchen exit door, adjust sprinkler coverage at the basement office due to drop ceiling removal.
FIR14-00846 INSP-Final Inspection1/6/20151/7/20151/7/2015 2:27:16 PMPPASS
Fire sprinkler work passed both rough-in and final inspections. Permit finaled.
MIS15-00004 FIR-Final1/6/20151/7/20151/7/2015 1:25:12 PMANH
No access to complete inspection.
FIR14-00672 INSP-Final Inspection1/6/20151/7/20151/7/2015 1:13:14 PMAPASS
Scope of permit work completed. Fire sprinkler permit finaled.
FIR14-00671 INSP-Sprinkler Rough-in/Hydro1/6/20151/7/20151/7/2015 1:11:54 PMPPART
Concluded satisfactory pneumatic test of the new dry system.