BLD13-03531
| BLD-Framing/Rough-in | 1/6/2015 | 1/7/2015 | 1/7/2015 3:59:12 PM | P | PASS |
|
|
Please call Brian prior to inspection Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03530
| BLD-Framing/Rough-in | 1/6/2015 | 1/7/2015 | 1/7/2015 3:58:56 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03529
| BLD-Framing/Rough-in | 1/6/2015 | 1/7/2015 | 1/7/2015 3:58:42 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03528
| BLD-Framing/Rough-in | 1/6/2015 | 1/7/2015 | 1/7/2015 3:58:20 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD14-03533
| BLD-Framing/Rough-in | 1/7/2015 | 1/7/2015 | 1/7/2015 2:59:37 PM | P | PASS |
|
|
Dillon Phone #: ###-####. All interior steel stud framed walls except for restrooms ok. N o grid at this time.
|
BLD14-03665
| BLD-Final | 1/6/2015 | 1/7/2015 | 1/7/2015 2:32:18 PM | P | NR |
|
|
Please call 15min ahead for access, not in space yet - Steve Phone #: ###-####
|
BLD13-03524
| BLD-Final | 1/6/2015 | 1/7/2015 | 1/7/2015 2:13:53 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD13-03524
| DOC - Permit Finaled | 1/7/2015 | 1/7/2015 | 1/7/2015 2:13:42 PM | P | PASS |
|
|
|
BLD14-02689
| BLD-Framing/Rough-in | 1/7/2015 | 1/7/2015 | 1/7/2015 1:45:26 PM | P | FAIL |
|
|
John Phone #: ###-####. Remove all screws from fromtop tracks to grid. Install braces to structure above at 8ft. oc per approved plans. Electrical rough in inspection? Correction notice posted.
|
BLD13-03524
| BLD-Blower Door Test Results | 1/7/2015 | 1/7/2015 | 1/7/2015 1:39:53 PM | P | DONE |
|
|
5
|
BLD14-01480
| BLD-Wall Bracing | 1/6/2015 | 1/7/2015 | 1/7/2015 11:14:26 AM | A | PASS |
|
|
drywall shear fastening Phone #: ###-#### Inspection requested via web by Brian Stark
|
BLD14-01878
| BLD-Framing/Rough-in | 1/6/2015 | 1/7/2015 | 1/7/2015 9:52:55 AM | A | PART |
|
|
Ask for the building owner Tina at Silvercreek Software. She can show you to the remodel area. I will cut out the drywall in the door opening when I hang the other walls. I left it for privacy. Phone #: ###-#### Inspection requested via web by Gregg Stallings. interior steel stud framed walls ok pend. plumbing rough in inspection.
|
BLD14-03533
| BLD-Framing/Rough-in | 1/6/2015 | 1/7/2015 | 1/7/2015 9:07:19 AM | A | NR |
|
|
Dillon Phone #: ###-####. No city approved plans. Electrical rough in completed. Ok to start one side with shhretrock. Contractor will recall inspection for this afternoon or tomorrow morning.
|