ESC14-00343
| Aging Inspection | 1/7/2015 | 1/7/2015 | 1/7/2015 4:48:34 PM | | PASS |
|
|
Project complete with all permits finaled. No loose sediment or building materials remaining at site. ESC permit conditions satistied.
|
ESC14-00343
| DOC - Permit Finaled | 1/7/2015 | 1/7/2015 | 1/7/2015 4:47:43 PM | P | PASS |
|
|
|
ESC14-00663
| Aging Inspection | 1/7/2015 | 1/7/2015 | 1/7/2015 3:26:35 PM | | CANC |
|
|
rescheduled for 1/8
|
ESC14-00628
| Tracking Control | 1/7/2015 | 1/7/2015 | 1/7/2015 11:23:25 AM | P | FAIL |
|
|
Mud and dirt on sidewalk and alley.
Correction issued to Hunter Homes to clean up dirt from hard surfaces, maintain DI bags, and install perimeter sediment control as necessary.
|
ESC14-00629
| Tracking Control | 1/7/2015 | 1/7/2015 | 1/7/2015 11:21:24 AM | P | FAIL |
|
|
This parcel is a low discharge spot for Honeycomb. Work yesterday caused significant trackout and mud is on sidewalk, alley and has filled the DI bag at the stormdrain there.
Corrections: 1. Sweep up dirt and mud off hard surfaces. 2. Empty out filled drop inlet bags and replace with new or empty filter bags 3. Install perimeter wattles/gator guard at the edge of the corner to contain dirt.
Verbal CN issued to Hunter Homes RP Austin. Crew came onsite as I was there and brought wattles and will install and clean this afternoon.
Will check condition tomorrow.
|
ESC13-01279
| General Inspection | 1/7/2015 | 1/7/2015 | 1/7/2015 11:11:13 AM | | PASS |
|
|
Lucky Harris 13 has all infrastructure and utilities installed. Some common area landscaping remains. Currently 6 new SFHs by Hunter Homes are being built.
Streets will need to be swept at least 1x per week. DI bags installed, lined washout for projects located at south culdesac on Caddis St..
|
ESC14-01168
| Site Preparation | 1/6/2015 | 1/7/2015 | 1/7/2015 11:07:12 AM | A | PASS |
|
|
1 of 3 Lucky Harris 13 lots in a row off Pheasant Tail. Permits posted. Lined concrete washout located at the south culdesac (Caddis) and is being used as directed by Hunter Homes RP-supervisor Austin. Approved.
|
ESC14-01182
| Site Preparation | 1/7/2015 | 1/7/2015 | 1/7/2015 11:06:51 AM | A | PASS |
|
|
1 of 3 Lucky Harris 13 lots in a row off Pheasant Tail. Permits posted. Lined concrete washout located at the south culdesac (Caddis) and is being used as directed by Hunter Homes RP-supervisor Austin. Approved.
|
ESC14-01183
| Site Preparation | 1/7/2015 | 1/7/2015 | 1/7/2015 11:06:38 AM | A | PASS |
|
|
1 of 3 Lucky Harris 13 lots in a row off Pheasant Tail. Permits posted. Lined concrete washout located at the south culdesac (Caddis) and is being used as directed by Hunter Homes RP-supervisor Austin. Approved.
|
ESC14-00144
| General Inspection | 1/7/2015 | 1/7/2015 | 1/7/2015 10:52:29 AM | | PART |
|
|
East Valley subdivision has individual SFHs in progress by Tahoe Homes. Concrete washout is onsite and is lined. Will need to be replaced for next round of homes as is about 75% full.
No trackout to streets or onto Warm Springs. DI bags installed, clean up from storm in December has been completed. No corrections at this time other than housekeeping and the wash out.
|
ESC14-01028
| Random Inspection | 1/7/2015 | 1/7/2015 | 1/7/2015 10:42:28 AM | P | FAIL |
|
|
Stockpiles of dirt from the excavation and installation of foundation has been stockpiled in the sidewalk, gutter, and into the street.
Need to clean up dirt and educate foundation crew about proper stockpile storage.
Verbal request issued to Tahoe Homes RP.
|
ESC14-00706
| Aging Inspection | 1/7/2015 | 1/7/2015 | 1/7/2015 10:27:40 AM | | PASS |
|
|
Project complete, BLD permit finaled. No ESC corrections, site is landscaped/stabilized. Permit finaled.
|
ESC14-00706
| DOC - Permit Finaled | 1/7/2015 | 1/7/2015 | 1/7/2015 10:27:07 AM | P | PASS |
|
|
|
ESC14-00707
| Aging Inspection | 1/7/2015 | 1/7/2015 | 1/7/2015 10:17:43 AM | | PASS |
|
|
Addition complete. ESC permit conditions satisifed. Site stabilized. All permits finaled.
|
ESC14-00707
| DOC - Permit Finaled | 1/7/2015 | 1/7/2015 | 1/7/2015 10:17:04 AM | P | PASS |
|
|
|
ESC14-00715
| Aging Inspection | 1/7/2015 | 1/7/2015 | 1/7/2015 9:03:43 AM | | PASS |
|
|
Pool installed. Disturbed area stabilized. Permit finaled.
|
ESC14-00715
| DOC - Permit Finaled | 1/7/2015 | 1/7/2015 | 1/7/2015 9:03:14 AM | P | PASS |
|
|
|
ESC14-00432
| General Inspection | 1/7/2015 | 1/7/2015 | 1/7/2015 8:39:13 AM | | PASS |
|
|
Aralar subdivision project is currently inactive. Vehicles and equipment are stationary at site. Permit is posted. No trackout or discharges. Silt fence BMP and buffer area for 5 mile creek is installed and operating condition. No corrections needed.
|