Inspections for the day of: Tuesday, January 7, 2020.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE20-00065 Final1/7/20201/7/20201/7/2020 3:34:25 PMPPASS
call for access jay Phone #: ###-####
All wiring fished in, all light weight luminaires. Final ok
ELE19-03488 Electrical Rough-In1/7/20201/7/20201/7/2020 2:53:00 PMPPART
Please call Luke for partial ceiling inspection on 5th floor. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo 4-05-23- It shall be unlawful for any person to cover in any way any wiring or equipment without first having the same inspected be an electrical inspector. No future boarders on grid.
110.26- Minimum work clearance shall be provided for HVAC line voltage access panels.
East outer offices, south outer and inner offices and corridor grid, storage rm and main copy supply grid rough in ok cover.
ELE19-03829 Electrical Rough-In1/7/20201/7/20201/7/2020 1:58:50 PMPPASS
Underground Inspection
Contact electrician on-site Shawn Evins
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Emergency underground conduits for fire pump, automatic transfer switches, connections to grounding electrode system as noted on contractor print rough in ok cover.
ELE19-03235 Final1/7/20201/7/20201/7/2020 12:56:09 PMPPASS
RE-inspect after issues were fixed. Phone #: ###-#### Inspection requested via web by Deb Morton
Final ok
ELE19-04831 Final1/7/20201/7/20201/7/2020 10:36:53 AMAFAIL
Phone #: ###-#### Inspection requested via web by Matt Oranday
Connection in panel not complete.
ELE19-04824 Final1/7/20201/7/20201/7/2020 10:35:37 AMAFAIL
Final electrical inspection in conjunction with Old Dominion final solar inspection.

Thank you ; have a nice day! Phone #: ###-#### Inspection requested via web by JENNY EMEL
Connection in panel not complete.
ELE19-04799 Electrical Rough-In1/7/20201/7/20201/7/2020 9:59:45 AMAPASS
Underground stub ups at panels Phone #: ###-#### Inspection requested via web by Jason Parke
Underground stubs at panelssouth east corner and east branch underground with runs to car charging stations rough in ok cover.
ELE19-03235 Final1/6/20201/7/20201/7/2020 9:32:54 AMAFAIL
Final - please call Mike 208.283.9055 Phone #: ###-#### Inspection requested via web by Deb Morton
314.25- All boxes shall have covers installed completely covering boxes. 4 open boxes found midway near south exit.