BLD19-03141
| BLD-Aging Inspection | 1/7/2020 | 1/7/2020 | 1/9/2020 10:18:11 AM | | PEND |
|
|
|
BLD19-01042
| BLD-Aging Inspection | 1/7/2020 | 1/7/2020 | 1/9/2020 10:17:41 AM | | PEND |
|
|
|
BLD18-03197
| BLD-Aging Inspection | 1/7/2020 | 1/7/2020 | 1/9/2020 10:17:22 AM | | PEND |
|
|
|
BLD19-02621
| BLD-Conference | 1/6/2020 | 1/7/2020 | 1/8/2020 11:58:41 AM | P | DEFR |
|
|
Pre-Framing Inspection conference. Please call Nic a half hour before arrival. Thanks, Phone #: ###-#### Inspection requested via web by Nic Van Diepen
|
BLD19-04911
| BLD-Final | 1/6/2020 | 1/7/2020 | 1/8/2020 9:19:38 AM | P | NR |
|
|
call ahead Don - solar panels Phone #: ###-####// needs ele 1st
|
BLD19-02246
| BLD-Energy code compliance | 1/3/2020 | 1/7/2020 | 1/8/2020 9:19:09 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kristy Newkirk
|
BLD19-04588
| BLD-Footing | 1/7/2020 | 1/7/2020 | 1/8/2020 9:18:56 AM | P | PASS |
|
|
Preston Phone #: ###-####,, post holes ok
|
BLD19-04709
| BLD-Footing | 1/7/2020 | 1/7/2020 | 1/7/2020 2:23:15 PM | P | PASS |
|
|
steve Phone #: ###-####// post holes ok
|
BLD20-00022
| BLD-Framing/Rough-in | 1/6/2020 | 1/7/2020 | 1/7/2020 1:54:22 PM | A | PART |
|
|
Call ahead to meet there // Suzy Phone #: 20, work in progress
|
BLD19-03778
| BLD-Framing/Rough-in | 1/6/2020 | 1/7/2020 | 1/7/2020 1:52:10 PM | P | PART |
|
|
Phone #: 2088675509 >> Inspection requested via mobile web by Rod // brace trusses, add point load in basement// ok to insulate
|
BLD19-04226
| BLD-Final | 1/7/2020 | 1/7/2020 | 1/7/2020 1:49:24 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Michael McHargue
|
BLD19-00248
| BLD-Framing/Rough-in | 1/7/2020 | 1/7/2020 | 1/7/2020 1:48:58 PM | A | PART |
|
|
Gypsum Ceilings 1A - 2A Phone #: ###-#### Inspection requested via web by Chris Fuhrman// ok pending trades
|
BLD19-00885
| BLD-Final | 1/3/2020 | 1/7/2020 | 1/7/2020 12:08:59 PM | A | DONE |
|
|
Garage Code: 0713 Phone #: ###-#### Inspection requested via web by Steve Hanson
|
BLD19-00885
| DOC - Permit Finaled | 1/7/2020 | 1/7/2020 | 1/7/2020 12:08:36 PM | P | PASS |
|
|
c of o issued
|
MIS19-00024
| DOC - Permit Finaled | 1/7/2020 | 1/7/2020 | 1/7/2020 12:06:14 PM | P | PASS |
|
|
|
BLD18-02193
| BLD-Final | 1/2/2020 | 1/7/2020 | 1/7/2020 12:05:04 PM | A | PEND |
|
|
PJ Smith// status of public works pass
|
BLD19-02834
| BLD-Conference | 1/6/2020 | 1/7/2020 | 1/7/2020 12:03:36 PM | A | PART |
|
|
Mark -wants to discuss framing Phone #: ###-####,,ok to drill through microlam sitting on bearing wall
|
BLD19-02406
| BLD-Concrete | 1/6/2020 | 1/7/2020 | 1/7/2020 8:39:04 AM | A | PART |
|
|
We canceled the afternoon inspections and are rescheduling for same inspection at 3rd lift for CMU rebar- MTI is scheduled for rebar and Observation inspection at 8:00 am. This lift will also entail two sets of pyramids for breaks. any questions please feel free to contact me at anytime.
Thank You Phone #: ###-#### Inspection requested via web by Ron Oswald
|
BLD19-02461
| BLD-Footing | 1/6/2020 | 1/7/2020 | 1/7/2020 8:30:39 AM | A | PART |
|
|
inground spa steel structural inspection Phone #: ###-#### Inspection requested via web by Brodie Schmidt// ok after cleaning out debis
|
BLD19-02406
| BLD-Concrete | 1/6/2020 | 1/7/2020 | 1/6/2020 3:23:07 PM | P | CANC |
|
|
This inspection is for partial 3rd lift at CMU. Contractor notes they will be ready at 2:00 pm. MTI will be onsite for Rebar and observation this lift. Any questions please feel free to contact me at anytime.
Thank You, Phone #: ###-#### >> Inspection requested via web by Ron Oswald Inspection cancelled from web by: Ron Oswald
|
BLD19-02621
| BLD-Conference | 1/6/2020 | 1/7/2020 | 1/6/2020 2:59:47 PM | A | CANC |
|
|
Pre-Framing Inspection conference. Please call Nic a half hour before inspection. Thanks, Phone #: ###-#### >> Inspection requested via web by Nic Van Diepen Inspection cancelled from web by: Nic Van Diepen
|