BLD19-00534
| BLD-Wall Bracing | 1/7/2020 | 1/7/2020 | 1/8/2020 6:56:40 AM | P | CANC |
|
|
|
BLD19-04489
| BLD-Final | 1/6/2020 | 1/7/2020 | 1/7/2020 3:40:51 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Shane Hotchkiss//roof appears to be installed within code requirements//
|
BLD19-04489
| DOC - Permit Finaled | 1/7/2020 | 1/7/2020 | 1/7/2020 3:40:21 PM | P | PASS |
|
|
|
BLD19-01694
| BLD-Final | 1/7/2020 | 1/7/2020 | 1/7/2020 3:07:31 PM | P | FAIL |
|
|
Willie Phone #: ###-####//need blower door test//remove dust covers from smoke CO detectors//CN posted//
|
BLD19-00217
| BLD-Final | 1/7/2020 | 1/7/2020 | 1/7/2020 2:46:10 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//CN posted//address not posted on building// trim windows and caulk//
|
BLD18-02167
| BLD-Blower Door Test Results | 1/7/2020 | 1/7/2020 | 1/7/2020 1:57:41 PM | P | DONE |
|
|
3.63 ACH 50
|
BLD18-02167
| BLD-Final | 1/6/2020 | 1/7/2020 | 1/7/2020 1:54:42 PM | P | PART |
|
|
will call when ready....final ok--corrections made//Temp only, guard over window in bath until new tempered window is installed//will check back in one month//
|
BLD19-02700
| BLD-Wall Bracing | 1/7/2020 | 1/7/2020 | 1/7/2020 1:47:20 PM | P | PASS |
|
|
interior shear in garage, nailing verified by photos sent from contractor at joint, specifically asked about blocking and he asured that blocks were in place at time of nailing// ok to cover//
|
BLD19-00362
| BLD-Ceiling Grid Inspection | 1/6/2020 | 1/7/2020 | 1/7/2020 1:38:32 PM | A | PASS |
|
|
Troy Phone #: ###-####//remaining portions of area A and B//hallways in area A,B and C//
|
BLD19-01191
| BLD-Final | 1/6/2020 | 1/7/2020 | 1/7/2020 12:33:30 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Carter Little//installed per scope//
|
BLD19-01191
| DOC - Permit Finaled | 1/7/2020 | 1/7/2020 | 1/7/2020 12:33:12 PM | P | PASS |
|
|
|
BLD19-00538
| BLD-Wall Bracing | 1/3/2020 | 1/7/2020 | 1/7/2020 12:21:30 PM | A | FAIL |
|
|
Garage 4 shear inspection Phone #: ###-#### Inspection requested via web by Travis Blackburn//CN issued for anchor bolts, need to add hold down, galv nails @ treated plate, nailing at back, blockin per detail at trusses//
|
BLD19-02246
| BLD-Wall cover | 1/3/2020 | 1/7/2020 | 1/7/2020 11:00:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kristy Newkirk//ok to cover when fire blocks are foamed at electrical and plumbing penetrations//
|
BLD18-00988
| BLD-Final | 1/6/2020 | 1/7/2020 | 1/7/2020 10:42:06 AM | A | NR |
|
|
Judd Phone #: ###-####//no one was home//Talked with Judd not ready for final yet//
|
BLD19-00541
| BLD-Aging Inspection | 1/7/2020 | 1/7/2020 | 1/7/2020 8:36:58 AM | | PASS |
|
|
Demo was completed, permits issued for construction and under way
|
BLD19-01819
| BLD-Aging Inspection | 1/7/2020 | 1/7/2020 | 1/7/2020 8:36:05 AM | | PASS |
|
|
WIP
|