BLD00-01797
| BLD-Conference | 1/5/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | A | PASS |
|
|
###-#### ROD FOR CONF REVIEWEFD OCC SEWCPTRATIONS. 1/8/2001 11:21:46 AM
|
BLD00-01261
| BLD-Framing/Rough-in | 1/5/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/05/2001 at 16:03:02. Contact: ###-####. GROUT OK UNDER COLUMS/ 1/8/2001 10:30:10 AM
|
BLD00-01563
| BLD-Concrete | 1/8/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 07:06:20. Contact: ###-####.placed with special insp. pending report. 1/8/2001 4:28:23 PM
|
BLD00-01261
| BLD-Framing/Rough-in | 1/8/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 07:08:52. Contact: ###-####. ENTRY SOFFIT OK FOR COVER 1/8/2001 10:29:51 AM
|
BLD00-02451
| BLD-Final | 1/5/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | P | FAIL |
|
|
###-#### ###-#### structural ok need plm and mec sign offs. 1/9/2001 9:18:43 AM
|
BLD00-01777
| BLD-Final | 1/5/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | P | PASS |
|
|
FN OCC ROB-- ###-#### OK FOR L/C CARD WITH CONTRACTOR. 1/8/2001 11:51:37 AM
|