PLM00-04412
| Plumbing Rough-in | 1/5/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/05/2001 at 15:27:03. Contact: ###-####. top ri ok with high density insulation behind lav water in exterior wall 1/8/2001 9:22:58 AM
|
PLM00-04403
| Plumbing Rough-in | 1/8/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 11:12:25. Contact: ###-####. witnessed test on rcp stormdrain under building droped 1/8" in 4' mh in 20 min. just under 1 gallon. seems ok but need letter from micron engineer with allowences 1/8/2001 3:11:09 PM
|