Inspections for the day of: Monday, January 8, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00514 BLD-Other1/8/20011/8/20011/9/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/08/2001 at 09:25:32. Contact: ###-####. arch pop-outs at ext wall...masonry ok 1/9/2001 10:52:03 AM
BLD00-00443 BLD-Final1/5/20011/8/20011/8/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/05/2001 at 12:10:15. Contact: ###-####.c/n issued: plans, underfloor access,air-seal, etc. 1/8/2001 10:24:24 AM 1/8/2001 10:25:09 AM
BLD00-02668 BLD-Final1/5/20011/8/20011/8/2001 12:00:00 AMAPASS
FN PERRY- ###-####, c/n ok 1/8/2001 9:45:13 AM
BLD99-02803 BLD-Energy code compliance1/6/20011/8/20011/8/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/06/2001 at 13:43:00. Contact: ###-####. panels wrapped per previous insp...bldg 11 at 5 garages 1/8/2001 11:17:09 AM
BLD00-00514 BLD-Framing/Rough-in1/8/20011/8/20011/8/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/08/2001 at 09:24:45. Contact: ###-####. int masonry walls at bsmt " lockers, 1st lift ok 1/9/2001 10:52:57 AM
BLD00-03335 BLD-Framing/Rough-in1/8/20011/8/20011/8/2001 12:00:00 AMPPART
FR DON- ###-#### shear wall along stairs ok, add fasteners at exist joists; need clarify florr frame support at adjacent space under bld 00-02654 1/8/2001 4:15:20 PM
BLD00-02658 BLD-Final1/8/20011/8/20011/8/2001 12:00:00 AMPPART
8###-#### c/n, ok for t/o 1/8/2001 6:32:11 PM
BLD00-02659 BLD-Final1/8/20011/8/20011/8/2001 12:00:00 AMPPART
###-#### c/n, ok for t/o 1/8/2001 6:30:24 PM
BLD00-02865 BLD-Framing/Rough-in1/4/20011/8/20011/8/2001 12:00:00 AMPNR
FR INSP- TIM ###-#### ; conf only 1/9/2001 9:28:43 AM