BLD00-01773
| BLD-Framing/Rough-in | 1/4/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | A | PART |
|
|
###-####metal bldg engineer,new details for areas at roll up door ok, still need info from archtect for south section of wall 1 hr for 5 foot.firewall 1st layer install at north end ok to add 2nd layer/ 1/8/2001 11:23:33 AM
|
BLD00-02128
| BLD-Final | 1/5/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/05/2001 at 14:50:18. Contact: ###-####.ok subject to hchd and zoning. 1/8/2001 11:18:37 AM
|
BLD00-03291
| BLD-Final | 1/5/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-03301
| BLD-Energy code compliance | 1/5/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-02840
| BLD-Framing/Rough-in | 1/8/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | P | PART |
|
|
FR INSP- ROD ###-#### ok to insulate,fireblock reqd. 1/8/2001 4:06:39 PM nd 1/8/2001 4:06:44 PM 1/8/2001 4:06:59 PM
|
BLD00-03566
| BLD-Framing/Rough-in | 1/8/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | P | PART |
|
|
###-#### late pmneeds ele insp and fireretardant backing in restrooms. 1/8/2001 4:07:50 PM
|
BLD00-02923
| BLD-Framing/Rough-in | 1/8/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | P | PASS |
|
|
###-#### call 1/2 prior to meet
|
BLD99-02651
| BLD-Framing/Rough-in | 1/8/2001 | 1/8/2001 | 1/8/2001 12:00:00 AM | P | PART |
|
|
###-####needs achd,public works for a temp. also handrail at stairs need raised,all rest room rear grab bars need relocating. 1/8/2001 2:58:11 PM
|