Inspections for the day of: Monday, January 8, 2001.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02946 BLD-Wall cover1/4/20011/8/20011/8/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/04/2001 at 13:03:04. Contact: ###-####.
ok to rock 1/8/2001 9:31:15 AM
BLD00-02947 BLD-Wall cover1/4/20011/8/20011/8/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/04/2001 at 13:04:36. Contact: ###-####.
ok to rock 1/8/2001 9:31:00 AM
BLD00-02561 BLD-Framing/Rough-in1/5/20011/8/20011/8/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/05/2001 at 13:11:09. Contact: ###-####.
part shear//, east, south and1/2 of lower west of south side ok to cover 1/8/2001 10:14:55 AM
MEC00-04163 Pressure Test1/5/20011/8/20011/8/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/05/2001 at 15:19:22. Contact: ###-####.
below 20 psi. 1/8/2001 10:16:54 AM
BLD00-02368 BLD-Final1/5/20011/8/20011/8/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/05/2001 at 16:18:46. Contact: .
pass, c of o signed perm. occ. 1/8/2001 3:44:18 PM
BLD00-03321 BLD-Framing/Rough-in1/8/20011/8/20011/8/2001 12:00:00 AMPFAIL
###-####
c/n posted 1/8/2001 12:58:07 PM
BLD00-03409 BLD-Footing1/8/20011/8/20011/8/2001 12:00:00 AMPPART
###-####
wip on portion of ftg, ok per plan, will call in for insp. on rest of footing later 1/8/2001 12:16:16 PM
BLD00-02420 BLD-Framing/Rough-in1/8/20011/8/20011/8/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/08/2001 at 09:09:31. Contact: ###-####.
2 hr parapet wall framing ok on east side 1/9/2001 9:21:20 AM
BLD00-02420 BLD-Other1/8/20011/8/20011/8/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/08/2001 at 10:09:26. Contact: .
int.door frame cut into masonary wall, already done 1/8/2001 2:10:50 PM
BLD00-01683 BLD-Foundation1/8/20011/8/20011/8/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/08/2001 at 10:16:28. Contact: ###-####.
wip, ok per plan 1/8/2001 12:13:17 PM