Inspections for the day of: Tuesday, January 8, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR01-00525 FIR-Aging Inspection1/8/20021/8/20021/8/2002 12:00:00 AM NR
wip 1/8/2002 7:47:19 AM
BLD01-03068 FIRE-Final Inspection1/8/20021/8/20021/8/2002 12:00:00 AMAPASS
Added by Inspector: 409 On 1/8/2002 9:01:35 AM
FIR98-00256 INSP-Final Inspection1/7/20021/8/20021/8/2002 12:00:00 AMANR
###-#### rescheduled for 1/9 1/8/2002 11:35:18 AM
BLD96-02171 FIRE-Final Inspection1/7/20021/8/20021/8/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/07/2002 at 13:04:19. Contact: ###-####. need annual sprinkler system inspection; storage height above 12 ft 1/8/2002 9:52:01 AM
FIR01-00441 INSP-Sprinkler Rough-in/Hydro1/7/20021/8/20021/8/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/07/2002 at 14:07:26. Contact: ###-####. hydro on overhead okay; need to test alarms and tampers; aux drain sign; clearance at base of riser; escutcheons 1/8/2002 3:07:05 PM
BLD01-00234 FIRE-Alarm Testing1/7/20021/8/20021/8/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 01/07/2002 at 14:59:07. Contact: ###-####. no alarm test; walked through building with Stan and Wendell; numerous penetrations 1/8/2002 11:34:25 AM
BLD01-00186 FIRE-Sprinkler Rough-in1/7/20021/8/20021/8/2002 12:00:00 AMPFAIL
per rick around 1:30-- john-- ###-#### r/i- with GC - penetrations; need to test alarms; scheduled for 1/11 pm for final inspection 1/8/2002 3:08:27 PM
FIR01-00342 INSP-Final Inspection1/8/20021/8/20021/8/2002 12:00:00 AMPPASS
Added by Inspector: 409 On 1/8/2002 3:04:06 PM hydro and flush complete