FIR02-00275
| FIR-Aging Inspection | 1/8/2003 | 1/8/2003 | 1/8/2003 12:00:00 AM | | PART |
|
|
left message for Dan B to get status of this project 1/8/2003 10:05:37 AM
|
BLD01-01707
| FIRE-Final Inspection | 1/7/2003 | 1/8/2003 | 1/8/2003 12:00:00 AM | A | PASS |
|
|
after 10:00\\###-#### they will apply for an occupancy permit 1/8/2003 11:04:19 AM
|
FIR02-00502
| INSP-Final Inspection | 1/7/2003 | 1/8/2003 | 1/8/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/07/2003 at 15:16:32. Contact: ###-####. need hangers within 1 ft of end of pipe; gave approval to proceed in correcting overspacing adjacent to approved plans and gave them correction notice to resubmit for these areas 1/8/2003 10:04:50 AM
|
FIR01-00491
| INSP-Final Inspection | 1/8/2003 | 1/8/2003 | 1/8/2003 12:00:00 AM | P | FAIL |
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie AHU on 2nd floor not shutting down on alarm; lockout on circuit breaker for FACP; map at FACP; labels on grid for concealed detectors; troubles not reporting to monitoring company; record of completion due on final 1/8/2003 3:43:33 PM
|
FIR03-00002
| INSP-Final Inspection | 1/8/2003 | 1/8/2003 | 1/8/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/08/2003 at 10:56:17. Contact: ###-####. need retaining straps on several beam clamps; need to verify annual inspection on riser and that the riser room has sprinkler head 1/8/2003 4:14:03 PM
|