BLD06-00453
| FIRE-Conference | 1/8/2007 | 1/8/2007 | 1/8/2007 4:09:49 PM | P | DONE |
|
|
Dan and I went over fire extinguisher locations
|
FIR06-00841
| INSP-Supply line flush | 1/8/2007 | 1/8/2007 | 1/8/2007 3:54:32 PM | P | PASS |
|
|
Underground flush passed.
|
FIR06-00842
| INSP-Supply line flush | 1/8/2007 | 1/8/2007 | 1/8/2007 3:53:49 PM | P | PASS |
|
|
Underground flush passed.
|
FIR06-00843
| INSP-Supply line flush | 1/8/2007 | 1/8/2007 | 1/8/2007 3:52:17 PM | P | PASS |
|
|
Underground flush passed
|
BLD05-03106
| FIRE-Final Inspection | 1/5/2007 | 1/8/2007 | 1/8/2007 12:32:41 PM | A | PASS |
|
|
life safety finaled
|
FIR05-00536
| INSP-Sprinkler Rough-in | 1/5/2007 | 1/8/2007 | 1/8/2007 11:24:49 AM | A | PASS |
|
|
See city approved plans for additional areas where the piping located above hardlids can be covered on the 2nd, 3rd and 4th floors.
|
FIR06-00631
| INSP-Sprinkler Rough-in/Hydro | 1/8/2007 | 1/8/2007 | 1/8/2007 10:44:27 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 1/8/2007 at 9:46:53 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jan 8 2007 10:44AM.
|