Inspections for the day of: Monday, January 8, 2007.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAimee Hughes
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-01162 Tracking Control1/3/20071/8/20071/8/2007 2:44:34 PMAPASS
Issues on c/n have been addressed.
ESC06-01075 Tracking Control1/3/20071/8/20071/8/2007 2:43:18 PMAPASS
Site looks okay, issues on verbal c/n have been addressed.
ESC06-00418 Conference1/8/20071/8/20071/8/2007 2:35:12 PMPPART
Met with RP to inspect site and discuss some concerns regarding sediment barriers along north side of project.
ESC05-01617 Tracking Control1/8/20071/8/20071/8/2007 12:13:25 PMPFAIL
c/n issued to address no ESC sign, silt fence along side of property needs replaced or repaired, trackout from site must be addressed and RP information needs to be updated on permit.
ESC03-01515 Site Final1/8/20071/8/20071/8/2007 11:59:28 AMPPASS
Final stabilization has been completed.
ESC03-01515 Tracking Control1/8/20071/8/20071/8/2007 11:58:39 AMPCANC
Duplicated inspection.
ESC06-00628 Conference1/5/20071/8/20071/8/2007 11:49:14 AMAPART
Met with owner and new RP to inspect site and discuss previous complaints about mud and dirt track out. Made some suggestions regarding access control and staging area to prevent any further problems. Also informed new RP to get his name added to the permit. Contacted complaintant.
ESC05-01157 Site Final1/8/20071/8/20071/8/2007 10:14:40 AMPPASS
Final stabilization has been completed.
ESC04-00961 Site Final1/8/20071/8/20071/8/2007 10:14:05 AMPPASS
Final stabilization has been completed.
ESC03-00820 Site Final1/8/20071/8/20071/8/2007 10:13:55 AMPPASS
Final stabilization has been completed.
ESC05-01332 Site Final1/8/20071/8/20071/8/2007 10:13:42 AMPPASS
Final stabilization has been completed.
ESC04-00052 Site Final1/8/20071/8/20071/8/2007 10:13:20 AMPPASS
Final stabilization has been completed.
ESC06-00966 Site Final1/8/20071/8/20071/8/2007 8:43:40 AMPPASS
Final stabilization has been completed.
ESC05-00965 Site Final1/8/20071/8/20071/8/2007 8:43:23 AMPPASS
Final stabilization has been completed.
ESC05-00965 Tracking Control1/8/20071/8/20071/8/2007 8:42:15 AMPCANC
Duplicated inspection.
ESC06-00966 Tracking Control1/8/20071/8/20071/8/2007 8:41:28 AMPCANC
Duplicated inspection
ESC06-01342 Tracking Control1/8/20071/8/20071/8/2007 8:36:22 AMPFAIL
c/n posted to address trash container and trash maintenance needed on site, silt fence needs to be replaced or repaired, and ESC sign needs to be posted (left one on site), contacted RP. all issues must be completed by 1-9-07.
ESC06-00896 Site Preparation12/27/20061/8/20071/8/2007 8:28:07 AMAPASS
Received 48 hr. notice. Site looks good, all bmp's are in place and construction is underway.